enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Economic Simplified Boiling Water Reactor - Wikipedia

    en.wikipedia.org/wiki/Economic_Simplified...

    The ESBWR received a positive Safety Evaluation Report [5] and Final Design Approval [6] on March 9, 2011. On June 7, 2011, the NRC completed its public comment period. [ 7 ] Final rule was issued on September 16, 2014, after two outstanding problems with GE-Hitachi's modeling of loads on the steam dryer were solved.

  3. Boiling water reactor safety systems - Wikipedia

    en.wikipedia.org/wiki/Boiling_water_reactor...

    The Reactor Protection System (RPS) is a system, computerized in later BWR models, that is designed to automatically, rapidly, and completely shut down and make safe the Nuclear Steam Supply System (NSSS – the reactor pressure vessel, pumps, and water/steam piping within the containment) if some event occurs that could result in the reactor entering an unsafe operating condition.

  4. Nuclear reactor safety system - Wikipedia

    en.wikipedia.org/wiki/Nuclear_reactor_safety_system

    The Automatic Depressurization System (ADS) consists of a series of valves which open to vent steam several feet under the surface of a large pool of liquid water (known as the wetwell or torus) in pressure suppression type containments (typically used in boiling water reactor designs), or directly into the primary containment structure in ...

  5. GE BWR - Wikipedia

    en.wikipedia.org/wiki/GE_BWR

    BWR Type 2 (BWR-2, BWR/2): Introduced in 1963, >500 MW e, typically around 650 MW e gross (Oyster Creek, Nine Mile Point 1). [4] [5] Included a large direct cycle. 5 recirculation loops, variable speed external recirculation pumps (one pump per loop, each pump's flow rate could be varied from 6,400 to 32,000 US gallons per minute (0.40 to 2.02 ...

  6. Advanced boiling water reactor - Wikipedia

    en.wikipedia.org/wiki/Advanced_boiling_water_reactor

    Slightly different versions of the ABWR are offered by GE-Hitachi, Hitachi-GE, and Toshiba. [5]In 1997 the GE-Hitachi U.S. ABWR design was certified as a final design in final form by the U.S. Nuclear Regulatory Commission, meaning that its performance, efficiency, output, and safety have already been verified, making it bureaucratically easier to build it rather than a non-certified design.

  7. Survey: Small businesses are feeling more optimistic about ...

    www.aol.com/survey-small-businesses-feeling-more...

    A recent survey shows small business owners are feeling more optimistic about the economy following the election. The Uncertainty Index declined 12 points in November to 98, following October’s ...

  8. Boiling water reactor - Wikipedia

    en.wikipedia.org/wiki/Boiling_water_reactor

    By using the water injection and steam flow rates, the feed water control system can rapidly anticipate water level deviations and respond to maintain water level within a few inches of set point. If one of the two feedwater pumps fails during operation, the feedwater system will command the recirculation system to rapidly reduce core flow ...

  9. Trump's only Manhattan electoral win is this block on the ...

    www.aol.com/news/trumps-only-manhattan-electoral...

    That was a 7-point improvement from how he performed against Joe Biden in 2020. Most of his gains came from fewer Democrats turning out for Harris. She underperformed Biden in every borough of the ...