enow.com Web Search

  1. Ad

    related to: load calculation for crane lifting equipment prices

Search results

  1. Results from the WOW.Com Content Network
  2. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Working_load_limit

    It is usually marked on the equipment by the manufacturer. It is a calculation of the Minimum Breaking Strength (MBS) also known as Minimum Breaking Load (MBL) divided by a safety factor, usually ranging from 4 to 6 on lifting equipment. The factor can be as high as 10:1 or 10 to 1, if the equipment poses a risk to a person's life.

  3. Active heave compensation - Wikipedia

    en.wikipedia.org/wiki/Active_heave_compensation

    AHC cranes need to calculate the vertical displacement and/or the velocity of the crane tip position in order to actively heave compensate a load sub-sea. A good AHC-crane is able to keep its load steady with a deviation of a few centimeters in waves up to 8m (+/-4m). AHC cranes are typically used for sub-sea lifting operations or construction ...

  4. Passive heave compensation - Wikipedia

    en.wikipedia.org/wiki/Passive_heave_compensation

    Passive heave compensation is a technique used to reduce the influence of waves upon lifting and drilling operations. [1] A simple passive heave compensator (PHC) is a soft spring which utilizes spring isolation to reduce transmissibility to less than 1. [2]

  5. Lifting Operations and Lifting Equipment Regulations 1998

    en.wikipedia.org/wiki/Lifting_Operations_and...

    The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are set of regulations created under the Health and Safety at Work etc. Act 1974 which came into force in Great Britain on 5 December 1998 [1] and replaced a number of other pieces of legislation which previously covered the use of lifting equipment.

  6. Design load - Wikipedia

    en.wikipedia.org/wiki/Design_load

    For example, a crane with a design load of 20 tons is designed to be able to lift loads that weigh 20 tons or less. However, when a failure could be catastrophic, such as a crane dropping its load or collapsing entirely, a factor of safety is necessary. As a result, the crane should lift about 2 to 5 tons at the most.

  7. Counterweight - Wikipedia

    en.wikipedia.org/wiki/Counterweight

    A simple crane. A counterweight is a weight that, by applying an opposite force, provides balance and stability of a mechanical system. [1] The purpose of a counterweight is to make lifting the load faster and more efficient, which saves energy and causes less wear and tear on the lifting machine.

  8. Crane (machine) - Wikipedia

    en.wikipedia.org/wiki/Crane_(machine)

    Greco-Roman Trispastos ("Three-pulley-crane"), a simple crane type (150 kg load) A crane for lifting heavy loads was developed by the Ancient Greeks in the late 6th century BC. [7] The archaeological record shows that no later than c. 515 BC distinctive cuttings for both lifting tongs and lewis irons begin to appear on stone blocks of Greek ...

  9. Offshore crane shock absorber - Wikipedia

    en.wikipedia.org/wiki/Offshore_crane_shock_absorber

    An offshore crane shock absorber is a gas spring with hydraulic damping used to reduce dynamic loads during offshore lifting. The lifting capacity of the offshore crane can be increased significantly during lifting in high sea states if a shock absorber is fitted.

  1. Ad

    related to: load calculation for crane lifting equipment prices