Search results
Results from the WOW.Com Content Network
The 4N71 was a 4-speed automatic transmission from Nissan Motors. It was available as either a light-duty ("L4N71B") or medium-duty ("E4N71B") unit for rear wheel drive vehicles with longitudinal engines. The latter used an electronically controlled lock up torque converter. Applications:
Saginaw Metal Casting Operations is an automobile engine foundry plant in Saginaw, Michigan. Opened under GM management in 1919, the factory produces engine blocks and cylinder heads for General Motors vehicles. The factory currently occupies 1.9 million square feet on 490 acres.
1995–2010 4T40-E/4T45-E — 4-speed light-duty (used in smaller front wheel drive GM vehicles) 1991–2010 4T60-E/4T65-E/4T65E-HD — 4-speed medium-duty (used in larger front wheel drive GM vehicles) 1993–2010 4T80-E — 4-speed heavy-duty (used in large FWD GM vehicles, only with Cadillac NorthStar V8 and Related Oldsmobile V8)
parts list: A list, usually tabular and often on the drawing (if not accompanying the drawing on a separate sheet), listing the parts needed in an assembly, including subparts, standard parts, and hardware. There is no consistently enforced distinction between an L/M, a BoM, or a P/L. PLM: product lifecycle management; plant lifecycle management
A Toploader transmission is a manually shifted gearbox design built in three-speed and four-speed configurations, introduced in 1963 by the Ford Motor Company to replace the BorgWarner T-10. It was used in most Fords and Mercurys from 1964 until 1973, as well as in some foreign models, and is officially designated the 3.03 three speed or Ford ...
That 18-4 record we mentioned earlier is 12-10 against the spread (6-5 at home). Winning 55% of the time is pretty good if you are in the gambling business, but a sample size of 11 home games is ...
The following is an excerpt from the latest edition of Yahoo's fantasy football newsletter, Get to the Points! If you like what you see, you can subscribe for free here. A players-to-drop column ...
The PBS is identical in format to the work breakdown structure (WBS), but is a separate entity and is used at a different step in the planning process. The PBS precedes the WBS and focuses on cataloguing all the desired outputs (products) needed to achieve the goal of the project.