Search results
Results from the WOW.Com Content Network
Splicing timber piles is still quite common and is the easiest of all the piling materials to splice. The normal method for splicing is by driving the leader pile first, driving a steel tube (normally 60–100 cm long, with an internal diameter no smaller than the minimum toe diameter) half its length onto the end of the leader pile.
Franki piles can be installed raked (or sloped) with a tilt of up to 4:1. [5] Raked Franki piles are always reinforced and are particularly suitable for structures subject to dynamic forces. [1] Driving methods such as open-ended coring, rock socketing, and composite shaft construction are occasionally used to overcome unique site problems. [3]
Concrete spun pile driving using diesel hammer in Patimban Deep Sea Port, Indonesia. A modern diesel pile hammer is a large two-stroke diesel engine. The weight is the piston, and the apparatus which connects to the top of the pile is the cylinder. Piledriving is started by raising the weight; usually a cable from the crane holding the pile ...
A pile is a slender element cast in the ground or driven into it. Since pile construction as well as the final product are mostly invisible, engineers have often questioned their integrity, i.e. their compliance with project drawings and specifications. In fact, experience [1] has shown that in piles, of all kinds flaws may occur. The purpose ...
A pile splice joins two segments of a driven pile, using either a weld (typical for H beams), grout or mechanical means (typical for precast concrete piles). Pile splices enable the use of shorter segments, which allows for driving piles in low-headroom situations such as under bridges or inside buildings. [ 1 ]
CM professional practice includes specific activities such as defining the responsibilities and management structure of the project management team, organizing and leading by implementing project controls, defining roles and responsibilities, developing communication protocols, and identifying elements of project design and construction likely ...
construction site workers loading water, sand, ballast and cement into a concrete mixer. Concrete is typically used in commercial buildings and civil engineering projects, for its strength and durability. Concrete is a mix of cement and water plus an aggregate such as sand or stone. Its compression strength means it can support heavy weights. [5]
This is an engineering term for describing how far to drive piles. [1] It is also used in surveying when driving metal posts and monuments that are to be used as bench marks (ie. the elevation of which will be established to a high degree of accuracy). When a very high degree of stability is required the post will be inside an oil filled outer ...