enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. South African energy crisis - Wikipedia

    en.wikipedia.org/wiki/South_African_energy_crisis

    South Africa's energy crisis (or load shedding) is an ongoing period of widespread national power outages beginning at the end of 2007. [1] [2] The South African government-owned national power utility, and primary power generator, Eskom, and various parliamentarians have attributed these rolling blackouts to insufficient generation capacity. [3]

  3. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  4. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. [ 1 ] [ 2 ] During testing, adjustment, calibration, or verification procedures, a load bank is connected to the output of a power source, such as an electric generator ...

  5. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    In electrical engineering, utilization factor, , is the ratio of the maximum load which could be drawn to the rated capacity of the system. This is closely related to the concept of Load factor. The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw ...

  6. Diversity factor - Wikipedia

    en.wikipedia.org/wiki/Diversity_factor

    The diversified load is the total expected power, or "load", to be drawn during a peak period by a device or system of devices. The maximum system load is the combination of each device's full load capacity, utilization factor, diversity factor, demand factor, and the load factor. This process is referred to as load diversification.

  7. Volt-ampere - Wikipedia

    en.wikipedia.org/wiki/Volt-ampere

    For a simple electrical circuit running on direct current, the electrical current and voltage are constant. In that case, the real power ( P , measured in watts ) is the product of the current ( I , measured in amperes ) and the voltage from one side of the circuit to the other ( V , measured in volts ):

  8. Mathematics of three-phase electric power - Wikipedia

    en.wikipedia.org/wiki/Mathematics_of_three-phase...

    In electrical engineering, three-phase electric power systems have at least three conductors carrying alternating voltages that are offset in time by one-third of the period. A three-phase system may be arranged in delta (∆) or star (Y) (also denoted as wye in some areas, as symbolically it is similar to the letter 'Y').

  9. Load profile - Wikipedia

    en.wikipedia.org/wiki/Load_Profile

    Graphs by hour of California's total electric load, the total load less solar and wind power (known as the duck curve) and solar power output. Data is for October 22, 2016, a day when the wind power output was low and steady throughout the day. In electrical engineering, a load profile is a graph of the variation in the electrical load versus ...