The plant has six induced draft cooling towers (IDCTs), which have a capacity of 30,000 cubic metres per hour (1,100,000 cu ft/h) with nine cells of 14 by 21 metres (46 ft × 69 ft) each. [4] The IDCTs use seawater, which is drawn from the intake channel of North Chennai Thermal Power Station , and fresh water requirement is met from a ...
Nabinagar Super Thermal Power Project is a coal-based thermal power plant located at Sivanpur village in Ankorha in Nabinagar taluk in Aurangabad district, Bihar.It was conceptualised in 1989 by the then Chief Minister of Bihar Satyendra Narayan Sinha who sent the [1] proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to then Prime Minister of ...
In 1989, the Chief Minister of Bihar and veteran leader Satyendra Narain Singh conceived the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to Rajiv Gandhi, the Prime Minister of India and Congress leader. [3]
As on 30 November 2015, NTPC has 110 MW Solar PV capacity under operation, 250 MW under construction, and 1260 MW under tendering. The company intends to add 10000 MW of Solar PV capacity in the next five years. On 18 July 2015, NTPC declared commercial its first Hydro Power plant at Koldam in the state of Himachal Pradesh. The company has a ...
NTPC and SAIL joined forces in March 2001 and took over a captive power plant (consisting of 2x60MW generators) located at the Durgapur Steel Plant and another (also 2x60 MW) at the Rourkela Steel Plant. NTPC formed another joint venture company with SAIL on in March 2002 in the name of Bhilai Electric Supply Company Ltd. (BESCL).
The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...
This unit went down in 2003 and then its renovation started by Bharat Heavy Electricals in April 2008 and was running at full capacity since November 2013 till 2022. Being old unit the same was decided to scrap down. [21] Stage-1: 2: 110: March 1986, recommissioned November 2014: Under dismantling
Talcher Super Thermal Power Station or NTPC Talcher Kaniha located in Angul district of the Indian state of Odisha is the first mega power plant of India to have an installed generation capacity of 3000MW. The power plant is one of the coal-based power plants of NTPC.