Search results
Results from the WOW.Com Content Network
BOD test bottles at the laboratory of a wastewater treatment plant. Biochemical oxygen demand (also known as BOD or biological oxygen demand) is an analytical parameter representing the amount of dissolved oxygen (DO) consumed by aerobic bacteria growing on the organic material present in a water sample at a specific temperature over a specific time period.
Because the Ultimate BOD is so time consuming, the 5-day BOD has been almost universally adopted as a measure of relative pollution effect. There are also many different COD tests of which the 4-hour COD is probably the most common. There is no generalized correlation between the 5-day BOD and the ultimate BOD.
For the Standard Methods 5210, [1] the BOD bottle “having 60 mL or greater capacity (300-mL)” is mentioned as one of the apparatus for the BOD test. A 60 mL BOD bottle is available and listed as "often convenient" by EPA (Environmental Protection Agency) Method 405.1. However, EPA Method 405.1 was written in 1974 and is no longer an EPA ...
Quantity take-offs (QTO) are a detailed measurement of materials and labor needed to complete a construction project. They are developed by an estimator during the pre-construction phase. This process includes breaking the project down into smaller and more manageable units that are easier to measure or estimate.
Measurement of SOD using an oxygen electrode. A: Water, B: Sediment, C: Box, D: Oxygen electrode. Oxygen can be consumed by organisms in the sediment. This process is referred to as sediment oxygen demand (SOD). Measurement of SOD can be undertaken by measuring the change of oxygen in a box on the sediment (benthic respirometer).
What if I have questions or need help with AOL Mail? You can find instant answers on our AOL Mail help page . Should you need additional assistance we have experts available around the clock at 800-730-2563.
Discover the latest breaking news in the U.S. and around the world — politics, weather, entertainment, lifestyle, finance, sports and much more.
The systems, equipment, items, processes, modes, and sequences of operations to be tested by the CxP (contractors or others) should be detailed and identified in the design engineer's construction documents (drawings and specifications), the construction request for proposal (RFP), the contractors' bid submission, the commissioning ...