Search results
Results from the WOW.Com Content Network
Krung Thep Aphiwat Central Terminal - Rangsit section opened 22.5 km (14.0 mi) 10 Light Red Line: Krung Thep Aphiwat Central Terminal - Taling Chan section opened 14.93 km (9.28 mi) 4 2023 3 July Yellow Line: Lat Phrao - Samrong section opened 28.62 km (17.78 mi) 23 2024 7 January Pink Line: Nonthaburi Civic Centre - Min Buri section opened
Greater Bangkok commuter rail is a commuter rail system in Bangkok Metropolitan Region, Phra Nakhon Si Ayutthaya Province, Saraburi Province, Lopburi Province, Suphan Buri Province, Ratchaburi Province, Chacheongsao Province, Nakhon Nayok Province, Prachinburi Province, and Samut Songkhram Province. It runs from and to the outskirts of the city ...
Krung Thep Aphiwat Central Terminal is the main terminus of all routes, replacing the former main station, Bangkok Railway Station (Hua Lamphong Station), in 2023. Phahonyothin and ICD Lat Krabang are the main freight terminals. As of 2024 SRT had 4,507 km (2,801 mi) of track, all of it meter gauge except the Airport Link
The Mangmoom Card (Thai for "spider) is a planned stored-value card for rapid transit systems in Bangkok, Thailand.Currently, many commuters carry multiple cards, since the existing Rabbit Card only works on the BTS Skytrain and Bangkok BRT, while the MRT Plus card works on the MRT Blue Line and MRT Purple Line.
The Office of Transport and Traffic Policy and Planning or OTP (Thai: สำนักงานนโยบายและแผนการขนส่งและจราจร) is a department of the Thai government, under the Ministry of Transport.
The plan for rapid transit in Bangkok has been in existence since 1994 when the Thai cabinet approved the Mass Rapid Transit System Master Plan (MTMP) for Bangkok. [65] The plan aimed to extend the mass transit lines and build new constructions to achieve a total length of 103 kilometers, including the Bangkok Elevated Road and Train System ...
Japan would provide Shinkansen technology for a high-speed rail link between Bangkok and the northern city of Chiang Mai. Phase 1 would connect Bangkok to Phitsanulok. It is estimated to cost 280 billion baht. Seven stations are planned for this segment: Krung Thep Aphiwat, Don Mueang, Ayutthaya, Lopburi, Nakhon Sawan, Phichit, and Phitsanulok.
Main track number is reference by Up track (direction away from Bangkok). In typical cases, leftmost main Up track always track #1 and increasing to the right, so signal on Up main track are number 1 in Up direction and 2 in Down direction, and for track #2 will be 3 and 4, track #3 will be 5 and 6 and so on.