The approved documents usually take the form of firstly stating the legislation and then providing a number of methods or ways which are deemed to satisfy the regulations. The building regulations do not aim to stifle innovation, and the introduction of each Approved Document re-states this government aim.
A Building Control Body should issue a "Completion Certificate" or "Final Certificate" upon the practical completion of each building project, to state that the work meets the technical requirements of the Building Regulations. If an Approved Inspector cannot do this due to omissions and/or known failures of the building work to show compliance ...
The Building Act 1984 permits detailed regulations to be made by the UK Secretary of State and/or the Welsh Ministers (of the Senedd). The building regulations made under the Building Act 1984 have been periodically updated, rewritten or consolidated, with the latest and current version being the Building (Amendment) Regulations 2016 (SI 2016/490).
The regulations placed specific duties on clients, designers and contractors, to plan their approach to health and safety. They applied throughout construction projects, from inception to final demolition and removal. They were introduced by the Health and Safety Executive's Construction Division to: [2] Improve project planning and management;
A building code (also building control or building regulations) is a set of rules that specify the standards for construction objects such as buildings and non-building structures. Buildings must conform to the code to obtain planning permission , usually from a local council.
The regulations were originally introduced in 1994 in compliance with European Directive 92/57/EEC and were previously revised in the CDM Regulations 2007. [citation needed] CDM Regulations 2015 define responsibilities according to particular roles from client, designer and contractor. The main changes from the CDM Regulations 2007 are: [4]
A certificate of occupancy is evidence that the building complies substantially with the plans and specifications that have been submitted to, and approved by, the local authority. It complements a building permit —a document that must be filed by the applicant with the local authority before construction to indicate that the proposed ...
The following buildings were exempted from the regulations A detached building, with less than 15m 2 floor area containing no sleeping accommodation. A detached single storey building, with less than 30m 2 floor area. It must be constructed substantially of non-combustible material, contain no sleeping accommodation and no point be within one ...