Search results
Results from the WOW.Com Content Network
In the same year, its name was changed to "National Thermal Power Corporation Limited". In 1983, NTPC began commercial operations and earned profits of INR 4.5 crores in FY 1982–83. By the end of 1985, it had achieved power generation capacity of 2000 MW. In 1986, it completed synchronisation of its first 500 MW unit at Singrauli.
Public sector undertaking National Thermal Power Corporation (NTPC) and several other state level power generating companies are engaged in operating coal-based thermal power plants. Apart from NTPC and other state level operators, some private companies also operate the power plants. [9] One coal plant was given environmental clearance in 2021 ...
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
[14] [15] Present equity holding is 100% by ntpc and now it's not a joint venture but is a wholly owned subsidiary company of ntpc. The company renovated and modernized the existing unit.The total cost of its renovation and modernization has been over Rs. 500 crores. In March 2013, the renovation work of two old units was completed.
1.2 Central public sector units. ... This is a list of electricity-industry related organisations based in India. ... PowerGrid Corporation of India; NHPC Limited ...
Unit-1 of stage-2 commissioned in November 2013. [10] Unit-2 of stage-2 commissioned in March 2015. The first unit (of stage-I) of NTPC Barh is expected to start generation from December 2019 instead of the scheduled August 2020, [11] while the second and third units of stage-I will be made operational in December 2020 and August 2021, respectively.
Talcher Super Thermal Power Station or NTPC Talcher Kaniha located in Angul district of the Indian state of Odisha is the first mega power plant of India to have an installed generation capacity of 3000MW. The power plant is one of the coal-based power plants of NTPC.
The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...