enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Working_load_limit

    The factor can be as high as 10:1 or 10 to 1, if the equipment poses a risk to a person's life. Working Load Limit (WLL) is the maximum working load designed by the manufacturer. This load represents a force that is much less than that required to make the lifting equipment fail or yield. The WLL is calculated by dividing MBL by a safety factor ...

  3. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction. Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground ...

  4. Crane (machine) - Wikipedia

    en.wikipedia.org/wiki/Crane_(machine)

    Crane (machine) Diagram of a modern crawler crane with outriggers. The latticed boom is fitted with a jib. Manual crane from the late 19th century used for unloading small loads from ships at the Port of Barcelona, Spain. A crane is a machine used to move materials both vertically and horizontally, utilizing a system of a boom, hoist, wire ...

  5. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    No panel rotation is being considered. Panel. Volume: V = w x h x d = 6.0 m x 3.0 m x 0.15 m = 2.7 m 3. Weight: W = V x concrete specific gravity = 2.7 m 3 x 24 kN/m 3 = 64.8 kN. Calculated casting bed suction. Suction area: A = w x h = 6.0 m x 3.0 m = 18 m 2. Assuming 1.0 kN/m 2 is applied for oiled steel formwork.

  6. Rigging (material handling) - Wikipedia

    en.wikipedia.org/wiki/Rigging_(material_handling)

    A team of riggers design and install the lifting or rolling equipment needed to raise, roll, slide, or lift objects such as heavy machinery, structural components, building materials, or large-scale fixtures with a crane, hoist, or block and tackle. Rigging comes from the rig, to set up or prepare. Rigging is the equipment such as wire rope ...

  7. Permissible stress design - Wikipedia

    en.wikipedia.org/wiki/Permissible_stress_design

    Permissible stress design is a design philosophy used by mechanical engineers and civil engineers. The civil designer ensures that the stresses developed in a structure due to service loads do not exceed the elastic limit. This limit is usually determined by ensuring that stresses remain within the limits through the use of factors of safety.

  8. Derrick - Wikipedia

    en.wikipedia.org/wiki/Derrick

    When the mast is rotated, the connected boom is swung from to the side. The control of the lifting location is done by the manipulation of the top pulley system and the rotation of the mast at the base. The load is lifted by another pulley system connected to the top of the boom. [2] In a medium load lifting, another construction method can be ...

  9. Structural load - Wikipedia

    en.wikipedia.org/wiki/Structural_load

    Structural load. A structural load or structural action is a mechanical load (more generally a force) applied to structural elements. [1][2] A load causes stress, deformation, displacement or acceleration in a structure. Structural analysis, a discipline in engineering, analyzes the effects of loads on structures and structural elements.