enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. List of elevator test towers - Wikipedia

    en.wikipedia.org/wiki/List_of_elevator_test_towers

    Became the tallest elevator test tower upon completion in 2015 7 G1 Tower [10] Hitachi: Hitachinaka, Ibaraki, Japan: 699 ft (213 m) 2010 Became the tallest elevator test tower upon completion in 2010 8 Asan Tower Hyundai Elevator: Icheon, South Korea: 673 ft (205 m) 2009 Became the tallest elevator test tower upon completion in 2009 [11] 9

  3. Solae (tower) - Wikipedia

    en.wikipedia.org/wiki/Solae_(tower)

    The Solae is an elevator test tower located in the city of Inazawa, Japan.It is owned by Mitsubishi Electric.The tower is 173 metres (568 ft). [1] When completed in 2007, it was the world's tallest elevator test tower.

  4. Open-circuit test - Wikipedia

    en.wikipedia.org/wiki/Open-circuit_test

    The open-circuit test, or no-load test, is one of the methods used in electrical engineering to determine the no-load impedance in the excitation branch of a transformer. The no load is represented by the open circuit, which is represented on the right side of the figure as the "hole" or incomplete part of the circuit.

  5. No-load loss - Wikipedia

    en.wikipedia.org/wiki/No-load_loss

    No-load loss (also called "fixed loss") is a portion of the loss of electricity that does not depend on the power being distributed through an electric circuit, as opposed to the load loss. [1] No-load loss typically depends on the operating voltage of a grid unit [2] and can be attributed to: dielectric loss in cables; [3]

  6. Elevator test tower - Wikipedia

    en.wikipedia.org/wiki/Elevator_test_tower

    The TK Elevator Test Tower, an elevator test tower in Rottweil, Baden-Württemberg, Germany. An elevator test tower is a structure usually 100 to over 200 metres (300 feet to over 600 feet) tall that is designed to evaluate the stress and fatigue limits of specific elevator cars in a controlled environment.

  7. Montgomery Elevator - Wikipedia

    en.wikipedia.org/wiki/Montgomery_Elevator

    The test tower was built in 1966 and has a height equivalent of 18-stories. There are three shafts in the tower, two of them are to test high-rise elevators, and one of them is to test safety features on the elevator (Freefall, Emergency Brakes, etc). The top floor of the test tower was a conference space for the company to have meetings.

  8. National Electrical Safety Code - Wikipedia

    en.wikipedia.org/.../National_Electrical_Safety_Code

    The process for obtaining a formal interpretation is outlined in the front of the code book. The NESC is currently published on a 5-year cycle. Urgent safety matters that require a change in between code editions are handled through a Tentative Interim Amendment (TIA) process. Original work on the NESC began in 1913.

  9. Load rejection - Wikipedia

    en.wikipedia.org/wiki/Load_rejection

    Load rejection in an electric power system is the condition in which there is a sudden load loss in the system which causes the generating equipment to be over-frequency.. A load rejection test is part of commissioning for power systems to confirm that the system can withstand a sudden loss of load and return to normal operating conditions using its governor. [1]