Search results
Results from the WOW.Com Content Network
Slurry seal is a mixture of bitumen emulsion and fine crushed aggregate that is spread on the surface of a road. Cold-mixed asphalt can also be made from bitumen emulsion to create pavements similar to hot-mixed asphalt, several inches in depth, and bitumen emulsions are also blended into recycled hot-mix asphalt to create low-cost pavements.
A slurry composed of glass beads in silicone oil flowing down an inclined plane Potato starch slurry. A slurry is a mixture of denser solids suspended in liquid, usually water. The most common use of slurry is as a means of transporting solids or separating minerals, the liquid being a carrier that is pumped on a device such as a centrifugal pump.
A slurry wall is a civil engineering technique used to build reinforced concrete walls in areas of soft earth close to open water, or with a high groundwater table. [1] This technique is typically used to build diaphragm (water-blocking) walls surrounding tunnels and open cuts, and to lay foundations .
To a section: This is a redirect from a topic that does not have its own page to a section of a page on the subject. For redirects to embedded anchors on a page, use {{R to anchor}} instead.
Full depth reclamation: The full thickness of the asphalt pavement and underlying material is pulverized to provide a uniform blend of material. [ 34 ] [ 37 ] A binding agent or stabilizing material may be mixed in to form a base course for the new pavement, or it may be left unbound to form a sub-base course.
In order to precisely place the cement slurry at a required interval on the outside of the casing, a plug is pumped with a displacement fluid behind the cement slurry column, which "bumps" in the casing shoe and prevents further flow of fluid through the shoe. This bump can be seen at surface as a pressure spike at the cement pump.
Borehole Mining (BHM) is a remote operated method of extraction (mining) of mineral resources through boreholes based on in-situ conversion of ores into a mobile form (slurry) by means of high pressure water jetting (hydraulicking). This process is carried-out from a land surface, open pit floor, underground mine or floating vessel through pre ...
Behind the cutting wheel there is a chamber where the excavated soil is either mixed with slurry (so-called slurry TBM) or left as-is (earth pressure balance or EPB shield), depending on the type of the TBM. The choice of TBM type depends on the soil conditions. Systems are also present for removal of the soil (or the soil mixed with slurry).