Search results
Results from the WOW.Com Content Network
A debris flow in Ladakh, triggered by storms in 2010. It has poor sorting and levees. Steep source catchment is visible in background. Debris-flow deposits are readily recognizable in the field. They make up significant percentages of many alluvial fans and debris cones along steep mountain fronts.
The flow table test or slump-flow test is a method to determine consistency of fresh concrete. Flow table test is also used to identify transportable moisture limit of solid bulk cargoes. [ 1 ] It is used primarily for assessing concrete that is too fluid (workable) to be measured using the slump test , because the concrete will not retain its ...
A schematic diagram of where the different types of sediment load are carried in the flow. Dissolved load is not sediment: it is composed of disassociated ions moving along with the flow. It may, however, constitute a significant proportion (often several percent, but occasionally greater than half) of the total amount of material being ...
A hyperconcentrated flow is a two-phase flowing mixture of water and sediment in a channel which has properties intermediate between fluvial flow and debris flow. [1] Large quantities of sand may be transported throughout the flow column, but the transport of suspended and bedload sediment along the channel depends on flow turbulence and high flow velocities, and coarser sediment remains as ...
A build-up of debris on the abutment can increase the obstruction area and increase local scour. Debris can deflect the water flow, changing the angle of attack and increasing local scour. Debris might also shift the entire channel around the bridge causing increased water flow and scour in another location. [3]
Self-consolidating concrete or self-compacting concrete (SCC) [1] is a concrete mix which has a low yield stress, high deformability, good segregation resistance (prevents separation of particles in the mix), and moderate viscosity (necessary to ensure uniform suspension of solid particles during transportation, placement (without external compaction), and thereafter until the concrete sets).
The test is carried out using a metal mould in the shape of a conical frustum known as a slump cone or Abrams cone, that is open at both ends and has attached handles.The tool typically has an internal diameter of 100 millimetres (3.9 in) at the top and of 200 millimetres (7.9 in) at the bottom with a height of 305 millimetres (12.0 in).The cone is placed on a hard non-absorbent surface.
Speed in the construction practices followed in ready mix concrete plant is followed continuously by having mechanized operations. The output obtained from a site mix concrete plant using a 8/12 mixer is 4 to 5 metric cubes per hour which is 30-60 metric cubes per hour in a ready mix concrete plant.