Search results
Results from the WOW.Com Content Network
A sanitary manhole under construction. A sanitary manhole (sewer manhole, [1] sanitary sewer manhole [2] or sewer maintenance hole [3]) is a manhole that is used as an access point for maintenance and inspection of an underground sanitary sewer system. Sanitary manholes are sometimes used as vents to prevent the buildup of pressurized sewage ...
In the U.S., every plumbing fixture must also be coupled to the system's vent piping. [1] Without a vent, negative pressure can slow the flow of water leaving the system, resulting in clogs, or cause siphonage to empty a trap. The high point of the vent system (the top of its "soil stack") must be open to the exterior at atmospheric pressure.
A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built.Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings.
Such a plan of a site is a "graphic representation of the arrangement of buildings, parking, drives, landscaping and any other structure that is part of a development project". [2] A site plan is a "set of construction drawings that a builder or contractor uses to make improvements to a property. Counties can use the site plan to verify that ...
Shafts are often entered through a manhole and closed by a manhole cover. They are constructed for a number of reasons including: For the construction of a tunnel; For ventilation of a tunnel or underground structure, aka ventilation shaft; As a drop shaft for a sewerage or water tunnel
Some spaces are large enough to require additional work to prevent water from moving along them and re-entering the waste stream, for example: insertion of hydrophilic material which swells to fill the void; lining of the entire connection and host pipe with continuous repair (YT repair) gaskets; and point repairs placed at the ends of the host ...
The latest officially released version of MasterFormat is the 2018 Edition, which uses the following Divisions: PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP:
The 16 Divisions of construction, as defined by the Construction Specifications Institute (CSI)'s MasterFormat, is the most widely used standard for organizing specifications and other written information for commercial and institutional building projects in the U.S. and Canada.