enow.com Web Search

  1. Ad

    related to: blower doors and duct testers work on two factor system requirements

Search results

  1. Results from the WOW.Com Content Network
  2. Blower door - Wikipedia

    en.wikipedia.org/wiki/Blower_door

    NFPA Clean Agent Retention testing (this type of testing is usually described as a door fan test rather than a blower door test) Duct leakage testing of forced air heating/cooling systems - both supply (vents) ducts and return ducts can be tested to determine if and how much they leak air. A duct test can be combined with a blower door test to ...

  3. Duct leakage testing - Wikipedia

    en.wikipedia.org/wiki/Duct_leakage_testing

    The blower door manual will include a correction table to determine a correction factor based on the pressure in the duct work. To calculate the duct leakage to outside, subtract the leakage with the registers sealed from the total building leakage and multiply by the correction factor. [1]

  4. Air Movement and Control Association - Wikipedia

    en.wikipedia.org/wiki/Air_Movement_and_Control...

    Two Water Test Facilities with chambers capable of simulating eight inches (203 mm) of rain-fall per hour and wind speeds of 50 mph (80 km/h). Multi Nozzle Chambers that are capable of measuring airflow up to 88,000 cfm. Circulator Fan Facility capable of testing 96 inch fans. Acoustic Duct Silencer Facility; ISO/IEC 17025 accredited

  5. Testing, adjusting, balancing - Wikipedia

    en.wikipedia.org/wiki/Testing,_adjusting,_balancing

    In heating, ventilation, and air conditioning (HVAC), testing, adjusting and balancing (TAB) are the three major steps used to achieve proper operation of heating, ventilation, and air conditioning systems. TAB usually refers to commercial building construction and the specialized contractors who employ personnel that perform this service.

  6. Ductwork airtightness - Wikipedia

    en.wikipedia.org/wiki/Ductwork_airtightness

    There are two major systems to classify ductwork airtightness, one based on European standards, the other based on ASHRAE standard 90.1-2010.Both are based on the leakage airflow rate at a given ductwork pressure divided by the product of the ductwork surface area and the same ductwork pressure raised to the power 0.65.

  7. Building airtightness - Wikipedia

    en.wikipedia.org/wiki/Building_airtightness

    An airtight building has several positive impacts [3] when combined with an appropriate ventilation system (whether natural, mechanical, or hybrid): [4] Lower heating bills due to less heat loss, with potentially smaller requirements for heating and cooling equipment capacities; Better performing ventilation system

  8. Air changes per hour - Wikipedia

    en.wikipedia.org/wiki/Air_changes_per_hour

    It is worth noting that ACH measured with the blower door test, at a differential pressure of 50 pascals, mimics the situation of a sustained 20 mph (32 km/h) wind outside. The natural air leakage, under calmer conditions, is likely to be much less. As a result, the so-called natural ACH may be a factor of 10-25 times smaller. [14]

  9. Air door - Wikipedia

    en.wikipedia.org/wiki/Air_door

    A typical commercial air curtain enclosure. In North America, the more commonly-used term for an air door is "air curtain". The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) defines an air door as follows: "In its simplest application, an air curtain is a continuous broad stream of air circulated across a doorway of a conditioned space.

  1. Ad

    related to: blower doors and duct testers work on two factor system requirements