Ads
related to: flatwork forms for concrete driveway construction
Search results
Results from the WOW.Com Content Network
A pervious concrete street in 2005. Pervious concrete (also called porous concrete, permeable concrete, no fines concrete and porous pavement) is a special type of concrete with a high porosity used for concrete flatwork applications that allows water from precipitation and other sources to pass directly through, thereby reducing the runoff from a site and allowing groundwater recharge.
For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Gypsum concrete is a building material used as a floor underlay [44] used in wood-frame and concrete construction for fire ratings, [44] sound reduction, [44] radiant heating, [45] and floor leveling. It is a mixture of gypsum, Portland cement, and sand. [44] One of its advantages is the lightweight nature.
Formwork is used in concrete construction as the frame for a structure in which fresh concrete is poured to then harden and take on the desired shape. [6] Aesthetic of concrete surfaces can be varied with different formwork sheathing (e.g. board shuttering, smooth formwork, form liner, form moulds, filter fleeces). The type of material used to ...
First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]
Ads
related to: flatwork forms for concrete driveway construction