Ads
related to: best screws for wood studs ceiling system detailsohiopowertool.com has been visited by 10K+ users in the past month
999 Goodale Blvd, Columbus, OH · Directions · (614) 481-2111
Search results
Results from the WOW.Com Content Network
Interior partitions supporting floor, ceiling or roof loads are called loadbearing walls; others are called non-loadbearing or simply partitions. Interior loadbearing walls are framed in the same way as exterior walls. Studs are usually 1 + 1 ⁄ 2 in × 3 + 1 ⁄ 2 in (38 mm × 89 mm) lumber spaced at 16 in (410 mm) on center. This spacing may ...
Stud. Sill plate / sole plate / bottom plate. Wall studs are framing components in timber or steel -framed walls, that run between the top and bottom plates. It is a fundamental element in frame building. The majority non- masonry buildings rely on wall studs, with wood being the most common and least-expensive material used for studs.
Lath seen from the back with white plaster coat oozing through. Lath and plaster is a building process used to finish mainly interior dividing walls and ceilings. It consists of narrow strips of wood (laths) which are nailed horizontally across the wall studs or ceiling joists and then coated in plaster. The technique derives from an earlier ...
Cement board. Cement board is composed of aggregated Portland cement with a glass-fiber mesh on the surfaces. This 5⁄16 inch (7.9 mm) thick cement board is designed as an underlayment for tile floors. These are 3-by-5-foot (91 by 152 cm) sheets. A cement board is a combination of cement and reinforcing fibers formed into sheets, of varying ...
dowel screw. hanger bolt. handrail bolt. Similar to a wood screw but with two pointed ends and no head, used for making hidden joints between two pieces of wood. A hanger bolt has wood screw threads on one end and machine threads on the other. A hanger bolt is used when it is necessary to fasten a metal part to a wood surface.
Upper wall plate, top plate or ceiling plate — upper wall plate which is fastened along the top of the wall studs, before the wall is lifted into position and on which the platform of the next story or the ceiling and roof assembly rest and are attached. A second layer of dimensional lumber is always fastened to the top plates of the erected ...
Ads
related to: best screws for wood studs ceiling system detailsohiopowertool.com has been visited by 10K+ users in the past month
999 Goodale Blvd, Columbus, OH · Directions · (614) 481-2111