enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Minimum_breaking_strength

    This load represents a force that is much less than that required to make the lifting equipment fail or yield. The WLL is calculated by dividing MBL by a safety factor (SF). An example of this would be a chain that has a MBL of 2000 lbf (8.89 kN ) would have a SWL or WLL of 400 lbf (1.78 kN) if a safety factor of 5 (5:1, 5 to 1, or 1/5) is used.

  3. Lifting equipment - Wikipedia

    en.wikipedia.org/wiki/Lifting_equipment

    Lifting equipment, also known as lifting gear, is a general term for any equipment that can be used to lift and lower loads. [1] Types of lifting equipment include heavy machinery such as the patient lift , overhead cranes , forklifts , jacks , building cradles, and passenger lifts, and can also include smaller accessories such as chains ...

  4. Construction site safety - Wikipedia

    en.wikipedia.org/wiki/Construction_site_safety

    Another prevention method on the construction site is to provide a scaffold that is rigid and sufficient to carry its own weight plus four times the maximum intended load without settling or displacement. [64] Ways to prevent injuries and improve safety include: Management safety; Integrate safety as a part of the job

  5. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    The weight of the element can be determined by the calculated volume, and using the specific gravity (normal weight reinforced concrete is approximately 24 kN/m3). Establishing the lifting anchor positions will influence the rigging arrangements used and therefore the static analysis of the rigging should be determined. Particular rigging ...

  6. Manual handling of loads - Wikipedia

    en.wikipedia.org/wiki/Manual_handling_of_loads

    Two people lifting or carrying the load not only distributes the weight evenly but also utilizes their natural lifting capacity, reducing the chances of strains or sprains. Proper communication between partners is necessary for coordination during the lift, ensuring the safety of both the participants, the goods being carried, and the ...

  7. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  8. Derrick - Wikipedia

    en.wikipedia.org/wiki/Derrick

    When the mast is rotated, the connected boom is swung from to the side. The control of the lifting location is done by the manipulation of the top pulley system and the rotation of the mast at the base. The load is lifted by another pulley system connected to the top of the boom. [2] In a medium load lifting, another construction method can be ...

  9. List of construction methods - Wikipedia

    en.wikipedia.org/wiki/List_of_Construction_methods

    construction site workers loading water, sand, ballast and cement into a concrete mixer. Concrete is typically used in commercial buildings and civil engineering projects, for its strength and durability. Concrete is a mix of cement and water plus an aggregate such as sand or stone. Its compression strength means it can support heavy weights. [5]