Search results
Results from the WOW.Com Content Network
The ST-26 was intended to provide for crossing of trenches and streams 6–6.5 m (20–21 ft) wide and barriers up to 2 m (6.6 ft) high by T-27, T-26 and BT light tanks: the bridge had a maximum load rating of 14 tonnes (15 short tons). The bridge could be laid with the help of the cable winch in 25–40 seconds without crew exit; the raising ...
Factory No. 174 produced engines and spare parts for the T-26, installed additional armour plates on some T-26s, replaced flame-throwers with 45 mm tank guns in turrets of 130 KhT-133 flame-throwing tanks, repaired tanks in army units (846 T-26s since the beginning of 1941) and mounted about 75 turrets from the T-26 and the T-50 as bunkers for ...
In civil engineering, clearance refers to the difference between the loading gauge and the structure gauge in the case of railroad cars or trams, or the difference between the size of any vehicle and the width/height of doors, the width/height of an overpass or the diameter of a tunnel as well as the air draft under a bridge, the width of a lock or diameter of a tunnel in the case of watercraft.
The world's longest suspension bridges are listed according to the length of their main span (i.e., the length of suspended roadway between the bridge's towers). The length of the main span is the most common method of comparing the sizes of suspension bridges, often correlating with the height of the towers and the engineering complexity involved in designing and constructing the bridge. [4]
TDOT has inspected more than 100 bridges over the course of 36 hours, the department said in a 5:30 p.m. social media post on X, formerly known as Twitter. Officials still have hundreds more to check.
The M1074 Joint Assault Bridge System (JAB, JABS) is an American armored military engineering vehicle based on the Abrams M1A1 main battle tank chassis. [ 8 ] : p.154 The M1074 was designed by Leonardo DRS for the U.S. Army and Marine Corps to provide deployable bridge capability for units engaged in military operations.
For the N.C. DOT contractor to execute the lift, a section of I-26 East will be closed from 4-8 a.m. on Feb. 17. Traffic will be detoured on Brevard Road south to Long Shoals and back to I-26, the ...
Interstate 26 reopened to traffic Wednesday, though reconstruction continues and there are still restrictions for trucks.