Search results
Results from the WOW.Com Content Network
A third person handing the hose to the two individuals on the ends facilitates the process. After the desired length of hose is connected, and sometimes the air removed from the interior with a fire hose vacuum, it is laid in a compartment or hose bed in a predetermined manner depending on the type of lay being built. Almost always the nozzle ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
A graphical depiction of the relationship between Δp / L, the pressure loss per unit length of pipe, versus flow volume Q, for a range of choices for pipe diameter D, for air at standard temperature and pressure. Units are SI. Lines of constant Re √ f D are also shown. [17] Friction loss takes place as a gas, say air, flows through duct work ...
Orifice plate showing vena contracta. An orifice plate is a thin plate with a hole in it, which is usually placed in a pipe. When a fluid (whether liquid or gaseous) passes through the orifice, its pressure builds up slightly upstream of the orifice [1] but as the fluid is forced to converge to pass through the hole, the velocity increases and the fluid pressure decreases.
The SI unit for permeability is the square metre (m 2).A practical unit for permeability is the darcy (d), or more commonly the millidarcy (md) (1 d ≈ 10 −12 m 2). The name honors the French Engineer Henry Darcy who first described the flow of water through sand filters for potable water supply.
This gas holder once operated by Gas del Estado is located in Villa Maipú, Partido de San Martín, Argentina. It was built in 1948 by MAN, and it was used to store coke gas produced by a near factory named Usina Corrales. With a total height of 85 metres (279 ft) and a diameter of 54 metres (177 ft), it was operational for short period of time ...
Gas initially in place (GIIP) or original gas in place (OGIP) denote the total estimated quantity (volume) of natural gas contained in a "subsurface" asset prior to extraction . [ 1 ] Gas Initially In Place = Gross Rock Volume * Net/Gross * Porosity * average initial Gas Saturation / Formation Volume Factor [ 2 ]
One side is connected to a flexible supply hose; the other may be attached to a manifold, valve, tool, or another hose. A female coupler is used on the supply side, and a male nipple is used on the receiving side. Fitting profiles have identifiable geometry on the male end, but care must be taken to use a compatible coupler.