enow.com Web Search

  1. Ads

    related to: industrial dock ladder lift

Search results

  1. Results from the WOW.Com Content Network
  2. Loading dock - Wikipedia

    en.wikipedia.org/wiki/Loading_dock

    Loading dock. A loading dock or loading bay is an area of a building where goods vehicles (usually road or rail) are loaded and unloaded. They are commonly found on commercial and industrial buildings, and warehouses in particular. Loading docks may be exterior, flush with the building envelope, or fully enclosed.

  3. Dock plate - Wikipedia

    en.wikipedia.org/wiki/Dock_plate

    A dock plate is form of portable bridge used to both span the gap and adjust for elevation differences between a truck bed and a loading dock or warehouse floor. [1] Other devices used to achieve the same ends include dock boards, and electric and pneumatic dock levelers and lifts. [2][3] These various devices differ in construction ...

  4. Aerial work platform - Wikipedia

    en.wikipedia.org/wiki/Aerial_work_platform

    Replacing an advertising poster in London using an aerial work platform. An aerial work platform (AWP), also known as an aerial device, elevating work platform (EWP), aerial lift, cherry picker, bucket truck or mobile elevating work platform (MEWP) is a mechanical device used to provide temporary access for people or equipment to inaccessible areas, usually at height.

  5. Crane (machine) - Wikipedia

    en.wikipedia.org/wiki/Crane_(machine)

    Manual crane from the late 19th century used for unloading small loads from ships at the Port of Barcelona, Spain. A crane is a machine used to move materials both vertically and horizontally, utilizing a system of a boom, hoist, wire ropes or chains, and sheaves for lifting and relocating heavy objects within the swing of its boom.

  6. Treadwheel crane - Wikipedia

    en.wikipedia.org/wiki/Treadwheel_crane

    A treadwheel crane (Latin: magna rota) is a wooden, human powered hoisting and lowering device. It was primarily used during the Roman period and the Middle Ages in the building of castles and cathedrals. The often heavy charge is lifted as the individual inside the treadwheel crane walks.

  7. Auxiliary floating drydock - Wikipedia

    en.wikipedia.org/wiki/Auxiliary_floating_drydock

    Auxiliary Floating Docks, Light (AFDL), also known as Auxiliary Floating Docks (AFD), were 288 ft (88 m) long, had a beam of 64 ft (20 m), and draft of 3 ft 3 in (0.99 m) empty and 31 ft 4 in (9.55 m) flooded to load a ship. A normal crew was 60 men. AFDL displacement was 1,200 tons and could lift 1,900 tons.

  1. Ads

    related to: industrial dock ladder lift