It has an installed capacity of nearly 50 MW, and when commissioned in 2021 it was the world's largest wind farm with floating turbines. [1] It is a demonstration project that consists of six turbines, all mounted on semi-submersible platforms. The first turbine, a Vestas V80-2 MW, was installed in 2018. This was joined by five larger V164-9.5 ...
"Cap." is the rated nameplate capacity of the wind farm "No." is the number of wind turbines "Model" is the model of wind turbine "Cost" is the total capital cost of the project up to commissioning. "Cap. Fac." is the average capacity factor, i.e. the average power generated by the windfarm, as a percentage of its nameplate capacity.
The project was the UK's first offshore wind farm, following the Vindeby in 1991 and Tunø in 1995, as well as being the largest offshore turbines erected in the world at the time. [3] It helped pave the way for more than 2700 bigger offshore turbines installed in British waters since then. [4]
The total offshore wind power capacity installed in the United Kingdom at the start of 2022 was 11.3 GW. By 2023, the United Kingdom had over 11,000 wind turbines with a total installed capacity of 30 gigawatts (GW): 15 GW onshore and 15 GW offshore, [2] The UK has set a target to have 50GW of offshore wind capacity by 2030. [3]
The first electricity was supplied by the site on 15 July 2009. The project consists of 25 Siemens Wind Power SWT-107-3.6 wind turbines, each rated at 3.6 MW capacity.. This gives the project a maximum output of 90 MW; a third greater than the neighbouring North Hoyle Offshore Wind Farm, but with five fewer wind turbines and spread over a smaller
It is one of nine offshore zones belonging to the Crown Estate which formed part of the third licence round for UK offshore wind farms. At the closest point the zone is 14 km from shore. [6] East Anglia Offshore Wind (EAOW) is a partnership between ScottishPower Renewables and Vattenfall. In December 2009, EAOW was announced as the developer ...
Teesside Wind Farm, or alternatively referred to as Redcar Wind Farm, is a 27 turbine 62 MW capacity offshore wind farm constructed just to the east of the mouth of the River Tees and 1.5 km north of Redcar off the North Yorkshire coast, in the North Sea, England. Construction of the windfarm began in February 2011 and was complete by June 2013.