Later in 2002, its installed capacity crossed 20,000 MW. [10] NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed the first day of listing with ₹75.55 per share. [13] On the day of listing, it became the third largest company in India in terms of market capitalisation. [14]
Feroze Gandhi Unchahar Thermal Power Plant has an installed capacity of 1,550 megawatts (2,080,000 hp), inclusive of Fourth Stage, that got operational in April 2017. The First unit was commissioned in November 1988. The coal for the plant is derived from North Karanpura Coalfield. The water source is from Sarda Sahyak Canal. [3]
The second unit of the 2×195 MW was commissioned on 13 June 2016. Muzaffarpur Thermal Power Station has an installed capacity of 610 MW. Another 500 MW extension has been planned. East Central Railway will provide uninterrupted supply of coal to the thermal power station. [7]
The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...
Kudgi Super Thermal Power Project will have an installed capacity of 4000 MW (3x800 MW in first stage and 2x800 MW in second stage). Doosan Power systems India Pvt Ltd will supply Steam Generator for the plant & Toshiba JSW Power Systems Pvt Ltd will supply super-critical steam turbine and generator and L&T Howden will supply Axial fans to NTPC for the plant. [2]
The plant has six induced draft cooling towers (IDCTs), which have a capacity of 30,000 cubic metres per hour (1,100,000 cu ft/h) with nine cells of 14 by 21 metres (46 ft × 69 ft) each. [4] The IDCTs use seawater, which is drawn from the intake channel of North Chennai Thermal Power Station , and fresh water requirement is met from a ...
It has been in the news due to the development of a new power plant by NTPC Limited in that area. The project was started in 2001 by Indian former Prime Minister Atal Bihari Vajpayee . NTPC Sipat has total installed capacity of 2980 MW and has two stages: Stage-I comprises 3 units of 660 megawatts each and Stage-II comprises 2 units of 500 ...
Its planned capacity is 3200 MW (4x800 MW). The land for the project is already acquired and the foundation stone for the project was laid in February 2014. [3] NTPC Limited awarded the EPC contract to BHEL for this project. [4] The first unit was synchronized with grid on 30.08.2018 at 05.12 AM IST.