The capacity credit can be much lower than the capacity factor (CF): in a not very probable scenario, if the riskiest time for the power system is after sunset, the capacity credit for solar power without coupled energy storage is zero regardless of its CF [3] (under this scenario all existing conventional power plants would have to be retained after the solar installation is added).
Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity, maximum effect or gross capacity, [1] is the intended full-load sustained output of a facility such as a power station, [2] [3] electric generator, a chemical plant, [4] fuel plant, mine, [5] metal refinery, [6] and many others.
Solar PV and wind turbines have a capacity factor limited by the availability of their "fuel", sunshine and wind respectively. A hydroelectricity plant may have a capacity factor lower than 100% due to restriction or scarcity of water, or its output may be regulated to match the current power need, conserving its stored water for later usage.
The nominal power of PV devices is measured under standard test conditions (STC), specified in standards such as IEC 61215, IEC 61646 and UL 1703. Specifically, the light intensity is 1000 W/m 2, with a spectrum similar to sunlight hitting the Earth's surface at latitude 35°N in the summer (airmass 1.5), the temperature of the cells being 25 °C.
State of charge (SoC) quantifies the remaining capacity available in a battery at a given time and in relation to a given state of ageing. [1] It is usually expressed as percentage (0% = empty; 100% = full). An alternative form of the same measure is the depth of discharge , calculated as 1 −
ANSI/ASHRAE/IES Standard 90.1: Energy Standard for Buildings Except Low-Rise Residential Buildings is an American National Standards Institute (ANSI) standard published by ASHRAE and jointly sponsored by the Illuminating Engineering Society (IES) that provides minimum requirements for energy efficient designs for buildings except for low-rise residential buildings (i.e. single-family homes ...
Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity (maximum output of a firm or nation). It is the relationship between output that is produced with the installed equipment, and the potential output which could be produced with it, if capacity was fully used. [ 1 ]
The availability factor should not be confused with the capacity factor. The capacity factor for a given period can never exceed the availability factor for the same period. The difference arises when the plant is run at less than full capacity, in which case the capacity factor is less than the availability factor.