enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. BS 5930 - Wikipedia

    en.wikipedia.org/wiki/BS_5930

    Excavations, boreholes probing and geophysical surveying are used to investigate the ground. Intrusive investigations should be sited, spaced and backfilled with care. The GI should give sufficient information to make good decisions on design, construction material selection. The condition and accessibility on site may affect the equipment used.

  3. Standard penetration test - Wikipedia

    en.wikipedia.org/wiki/Standard_penetration_test

    After the borehole has been advanced to a desired depth and excess cuttings have been removed, testing and sampling can be conducted. The test uses a thick-walled sampling tube, with an outside diameter of 5.01 cm (2 in) and an inside diameter of 3.5 cm (1.375 in), and a length of at least 60 cm (24 in).

  4. Eurocode 7: Geotechnical design - Wikipedia

    en.wikipedia.org/.../Eurocode_7:_Geotechnical_design

    In the Eurocode series of European standards (EN) related to construction, Eurocode 7: Geotechnical design (abbreviated EN 1997 or, informally, EC 7) describes how to design geotechnical structures, using the limit state design philosophy. It is published in two parts; "General rules" and "Ground investigation and testing".

  5. Boring (earth) - Wikipedia

    en.wikipedia.org/wiki/Boring_(earth)

    Testing of the material in boreholes is also possible. In soft ground the standard penetration test can be used to determine the strength of the material. In rock in-situ stress testing using hydrofracturing or overcoring , Acoustic Televiewer can be used to map discontinuities to determine their orientation.

  6. Geotechnical investigation - Wikipedia

    en.wikipedia.org/wiki/Geotechnical_investigation

    A USBR soil scientist advances a Giddings Probe direct push soil sampler.. Geotechnical investigations are performed by geotechnical engineers or engineering geologists to obtain information on the physical properties of soil earthworks and foundations for proposed structures and for repair of distress to earthworks and structures caused by subsurface conditions; this type of investigation is ...

  7. Core recovery parameters - Wikipedia

    en.wikipedia.org/wiki/Core_recovery_parameters

    It is the borehole core recovery percentage incorporating only pieces of solid core that are longer than 100 mm in length measured along the centerline of the core. In this respect pieces of core that are not hard and sound should not be counted though they are 100 mm in length.

  8. Silt fence - Wikipedia

    en.wikipedia.org/wiki/Silt_fence

    Silt fence installed on a construction site. Silt fences are often installed as perimeter controls. They are typically used in combination with sediment basins and sediment traps, as well as with erosion controls, which are designed to retain sediment in place where soil is being disturbed by construction processes (i.e., land grading and other earthworks).

  9. Casing (borehole) - Wikipedia

    en.wikipedia.org/wiki/Casing_(borehole)

    Casing Diameters of a Borehole Casing Diagram premium gas tight connections on a casing string. Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream.