enow.com Web Search

  1. Ads

    related to: 2x10x16 pressure treated span chart for concrete floor coating system

Search results

  1. Results from the WOW.Com Content Network
  2. Epoxy moisture control system - Wikipedia

    en.wikipedia.org/wiki/Epoxy_moisture_control_system

    Epoxy moisture control systems can be applied over concrete with relative humidity levels up to 100%, and there are systems available on the market today that can be applied over concrete that is physically damp. In some cases, with the use of an epoxy moisture control system, floor coverings can be installed just 7 days after the slab is poured.

  3. Voided biaxial slab - Wikipedia

    en.wikipedia.org/wiki/Voided_biaxial_slab

    [citation needed] Another major benefit of the system is its reduction in slab weight compared with regular solid decks. Up to 50% of the slab volume may be removed in voids, resulting in less load on structural members. [1] This also allows increased weight and/or span, since the self-weight of the slab contributes less to the overall load.

  4. Concrete sealer - Wikipedia

    en.wikipedia.org/wiki/Concrete_sealer

    They require a dry, clean surface during application to gain adhesion. Topical sealers may alter the coefficient of friction which can make substrates slick when wet – a condition that can be remedied by adding anti-skid materials. Life span is generally 1-5 years, although high-end epoxy/urethane systems can last significantly longer.

  5. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head

  6. Span (engineering) - Wikipedia

    en.wikipedia.org/wiki/Span_(engineering)

    In engineering, span is the distance between two adjacent structural supports (e.g., two piers) of a structural member (e.g., a beam). Span is measured in the horizontal direction either between the faces of the supports (clear span) or between the centers of the bearing surfaces (effective span): [1] A span can be closed by a solid beam or by ...

  7. Double tee - Wikipedia

    en.wikipedia.org/wiki/Double_tee

    The floor systems are mostly built from pre-topped double tees. This system evolved from the earlier use of tee systems where the flanges of the T-beams were connected. The concrete is then poured at the top of the tees during the construction to create the floor surface, hence the process is called field-placed concrete topping.

  1. Ads

    related to: 2x10x16 pressure treated span chart for concrete floor coating system