Search results
Results from the WOW.Com Content Network
OFF state. In the OFF state, i.e., when no electrical field is applied, the nematic liquid crystal molecules form a twisted configuration (aka helical structure or helix) between the two glass plates, G in the figure, which are separated by several spacers and coated with transparent electrodes, E 1 and E 2. The electrodes themselves are coated ...
The control action is the switching on/off of the boiler, but the controlled variable should be the building temperature, but is not because this is open-loop control of the boiler, which does not give closed-loop control of the temperature. In closed loop control, the control action from the controller is dependent on the process output.
The control action is the switching on/off of the boiler, but the controlled variable should be the building temperature, but is not because this is open-loop control of the boiler, which does not give closed-loop control of the temperature. In closed loop control, the control action from the controller is dependent on the process output.
The control action is the switching on/off of the boiler, but the controlled variable should be the building temperature, but is not because this is open-loop control of the boiler, which does not give closed-loop control of the temperature. In closed loop control, the control action from the controller is dependent on the process output.
The control action is the switching on or off of the boiler. The process variable is the building temperature. This controller operates the heating system for a constant time regardless of the temperature of the building. In a closed-loop control system, the control action from the controller is dependent on the desired and actual process variable.
The control action is the switching on/off of the boiler, but the controlled variable should be the building temperature, but is not because this is open-loop control of the boiler, which does not give closed-loop control of the temperature. In closed loop control, the control action from the controller is dependent on the process output.
House Republicans are scrambling to find a way to avoid a government shutdown after their second funding proposal was rejected, and are now planning to vote on a third proposal soon.
The control action is the switching on/off of the boiler, but the controlled variable should be the building temperature, but is not because this is open-loop control of the boiler, which does not give closed-loop control of the temperature. In closed loop control, the control action from the controller is dependent on the process output.