enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Cooling load temperature difference calculation method

    en.wikipedia.org/wiki/Cooling_load_temperature...

    The CLF is the cooling load at a given time compared to the heat gain from earlier in the day. [1] [5] The SC, or shading coefficient, is used widely in the evaluation of heat gain through glass and windows. [1] [5] Finally, the SCL, or solar cooling load factor, accounts for the variables associated with solar heat load.

  3. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw (which we call full load). For example, an oversized motor - 15 kW - drives a constant 12 kW load whenever it is on. The motor load factor is then 12/15 = 80%.

  4. Thermal transmittance - Wikipedia

    en.wikipedia.org/wiki/Thermal_transmittance

    To calculate thermal transmittance when there are "bridging" mortar joints it is necessary to calculate two quantities, known as R max and R min. R max can be thought of as the total thermal insulance obtained if it is assumed that there is no lateral flow of heat and R min can be thought of as the total thermal insulance obtained if it is ...

  5. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  6. Load profile - Wikipedia

    en.wikipedia.org/wiki/Load_Profile

    In a power system, a load curve or load profile is a chart illustrating the variation in demand/electrical load over a specific time. Generation companies use this information to plan how much power they will need to generate at any given time. A load duration curve is similar to a load curve. The information is the same but is presented in a ...

  7. Full load hour - Wikipedia

    en.wikipedia.org/wiki/Full_load_hour

    Full Load hour is a measure of the degree of utilisation of a technical system. [1] [2] [3] Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur.

  8. Load management - Wikipedia

    en.wikipedia.org/wiki/Load_management

    Capacity factor is a measure of the output of a power plant compared to the maximum output it could produce. Capacity factor is often defined as the ratio of average load to capacity or the ratio of average load to peak load in a period of time. A higher load factor is advantageous because a power plant may be less efficient at low load factors ...

  9. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    Base load plants usually have low costs per unit of electricity because they are designed for maximum efficiency and are operated continuously at high output. Geothermal power plants , nuclear power plants , coal-fired plants and bioenergy plants that burn solid material are almost always operated as base load plants, as they can be difficult ...