Search results
Results from the WOW.Com Content Network
The original service pattern was a single line from Fulton Ferry to East New York.On April 27, 1889, all Lexington Avenue trains began using the Myrtle Avenue elevated to Sands Street at the Brooklyn Bridge, while the old portion above Park Avenue, Hudson Avenue, and other streets to Fulton Ferry became part of the outer Myrtle Avenue service. [24]
a The route of the original IRT line, the first underground New York City rapid transit line, began at City Hall in the south, followed the IRT Lexington Avenue Line to 33rd Street, turned west on 42nd Street to Grand Central, followed the IRT 42nd Street Shuttle to Times Square, turned north on Broadway to 50th Street, followed the IRT ...
The lower level of the BMT Broadway Line is linked to the upper level of the BMT Broadway Line, the IRT Lexington Avenue Line and the BMT Nassau Street Line via passageways. The three BMT stations were linked on September 4, 1917, when the Broadway Line opened. [citation needed] The IRT was connected on January 16, 1978. [13]
MetroCard Vending Machine (MVM) The fares for services operated under the brands of MTA Regional Bus (New York City Bus, MTA Bus), New York City Subway (NYC Subway), Staten Island Railway (SIR), PATH, Roosevelt Island Tramway, AirTrain JFK, NYC Ferry, and the suburban bus operators Nassau Inter-County Express (NICE) and Westchester County Bee-Line System (Bee-Line) are listed below.
These lines and services were operated by the Brooklyn–Manhattan Transit Corporation (BMT) and city-owned Independent Subway System (IND) before the 1940 city takeover of the BMT. B Division rolling stock is wider, longer, and heavier than those of the A Division , measuring 10 or 9.75 ft (3,048 or 2,972 mm) by 60 or 75 ft (18.29 or 22.86 m).
[10] In 1989, the BMT 63rd Street Line opened as an extension of the express tracks of the BMT Broadway Line, connecting to the IND 63rd Street Line at Lexington Avenue–63rd Street station. A connection from the Broadway/63rd Street Lines to the IND Second Avenue Line opened in 2017.
The IND 63rd Street Line and BMT 63rd Street Line, also referred to as the 63rd Street Crosstown, Crosstown Route, [2] or Route 131-A, [3] are two rapid transit lines of the B Division of the New York City Subway system.
The New York Public Service Commission adopted plans for what was known as the Broadway–Lexington Avenue route on December 31, 1907. This route began at the Battery and ran under Greenwich Street, Vesey Street, Broadway to Ninth Street, private property to Irving Place, and Irving Place and Lexington Avenue to the Harlem River.