Dhaka Subway is an underground urban rail network being planned in Dhaka, the capital city of Bangladesh, by the Bangladesh Bridge Authority. Dhaka Subway was conceived as a separate transport system to the Dhaka Mass Rapid Transit network, commonly known as Dhaka Metro Rail .
The Dhaka Metro Rail is a mass rapid transit system serving Dhaka, the capital city of Bangladesh. It is owned and operated by the Dhaka Mass Transit Company Limited . [ 1 ] Together with a proposed subway system it is expected to reduce traffic congestion in the city.
The Dhaka Metro Rail (Bengali: ঢাকা মেট্রোরেল), or simply the Dhaka Metro, is a mass rapid transit system serving Dhaka, the capital and largest city of Bangladesh. It is operated by the Dhaka Mass Transit Company Limited (DMTCL). [ 2 ]
In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka. [ 1 ]
The MRT Line 4 (Bengali: এমআরটি লাইন ৪) of Dhaka Metro Rail is a proposed mass rapid transit line, stretching from the city's main railway station to the Bandar Upazila. This line is scheduled to be completed by 2030 and will be operated by the Dhaka Mass Transit Company Limited (DMTCL).
This is a route-map template for the Dhaka Metro, an under construction mass rapid transit system in Bangladesh.. For a key to symbols, see {{railway line legend}}.; For information on using this template, see Template:Routemap.
The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6. [4] On 11 December 2019, Dhaka Mass Transit Company Limited (DMTCL) signed a loan agreement with the Asian Development Bank (ADB) for pre-construction work of US$33.26 million, which was 74.60% of the required amount. [ 5 ]