Search results
Results from the WOW.Com Content Network
the permissible long term average depth of the water table (Dw) on the basis of agricultural drainage criteria; the soil's hydraulic conductivity (Ka and Kb) by measurements; the depth of the bottom of the aquifer (Di) the design drain spacing (L) can be found from the equation in dependence of the drain depth (Dd) and drain radius (r ...
Both the diameter of the pile and the depth of the pile are highly specific to the ground conditions, loading conditions, and nature of the project. Pile depths may vary substantially across a project if the bearing layer is not level. Drilled piles can be tested using a variety of methods to verify the pile integrity during installation.
Grade is usually expressed as a percentage - converted to the angle α by taking the inverse tangent of the standard mathematical slope, which is rise / run or the grade / 100. If one looks at red numbers on the chart specifying grade, one can see the quirkiness of using the grade to specify slope; the numbers go from 0 for flat, to 100% at 45 ...
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
Pile integrity testing using low-strain tests such as the TDR (Transient Dynamic Response) method, is a rapid way of assessing the continuity and integrity of concrete piled foundations. The test measures: pile length, or depth to anomalies; pile head stiffness; pile shaft mobility, which is dependent on pile section and concrete properties
According to the Federal Aviation Administration, the twin-engine Piper PA-31 crashed around 3:00 p.m. local time. In a video posted on Facebook, which showed the wreckage, the Victoria Police ...
There's a new No. 1-ranked player in the transfer portal. Washington State quarterback John Mateer is entering the transfer portal, Cougars coach Jake Dickert confirmed Monday. He's the No. 1 ...
Floor Area ratio is sometimes called floor space ratio (FSR), floor space index (FSI), site ratio or plot ratio. The difference between FAR and FSI is that the first is a ratio, while the latter is an index. Index numbers are values expressed as a percentage of a single base figure. Thus an FAR of 1.5 is translated as an FSI of 150%.