enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Cut and fill - Wikipedia

    en.wikipedia.org/wiki/Cut_and_fill

    A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...

  3. Earthworks (engineering) - Wikipedia

    en.wikipedia.org/wiki/Earthworks_(engineering)

    Heavy construction equipment is usually used due to the amounts of material to be moved — up to millions of cubic metres. Earthwork construction was revolutionized by the development of the scraper and other earth-moving machines such as the loader, the dump truck, the grader, the bulldozer, the backhoe, and the dragline excavator.

  4. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.

  5. Cut (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Cut_(earthworks)

    In civil engineering, a cut or cutting is where soil or rock from a relative rise is removed. Cuts are typically used in road, rail, and canal construction to reduce a route's length and grade. Cut and fill construction uses the spoils from cuts to fill in defiles to create straight routes at steady grades cost-effectively.

  6. Grade (slope) - Wikipedia

    en.wikipedia.org/wiki/Grade_(slope)

    If one looks at red numbers on the chart specifying grade, one can see the quirkiness of using the grade to specify slope; the numbers go from 0 for flat, to 100% at 45 degrees, to infinity as it approaches vertical. Slope may still be expressed when the horizontal run is not known: the rise can be divided by the hypotenuse (the slope length).

  7. Wheel tractor-scraper - Wikipedia

    en.wikipedia.org/wiki/Wheel_tractor-scraper

    The horsepower of the machine, depth of the cut, type of material, and slope of the cut area affect how quickly the pan is filled. When full, the pan is raised, the apron is closed, and the scraper transports its load to the fill area. There the pan height is set and the lip is opened (the lip is what the bottom edge of the apron is called), so ...

  8. Benchmark (surveying) - Wikipedia

    en.wikipedia.org/wiki/Benchmark_(surveying)

    An Ordnance Survey cut mark in the UK Occasionally a non-vertical face, and a slightly different mark, was used. The term benchmark, bench mark, or survey benchmark originates from the chiseled horizontal marks that surveyors made in stone structures, into which an angle iron could be placed to form a "bench" for a leveling rod, thus ensuring that a leveling rod could be accurately ...

  9. Construction estimating software - Wikipedia

    en.wikipedia.org/wiki/Construction_estimating...

    The SharpeSoft Estimator, displaying an example of a trench calculation. Calculations: Most estimating programs have built-in calculations ranging from simple length, area, and volume calculations to complex industry-specific calculations, such as electrical calculations, utility trench calculations, and earthwork cut and fill calculations.

  1. Related searches cut and fill calculations elevation chart for construction work and equipment

    cut and fill sectionscut and fill sections meaning
    cut and fill railwayrailway earthwork grading
    cut and fill soil