The flow table test or slump-flow test is a method to determine consistency of fresh concrete. Flow table test is also used to identify transportable moisture limit of solid bulk cargoes. [ 1 ] It is used primarily for assessing concrete that is too fluid (workable) to be measured using the slump test , because the concrete will not retain its ...
First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]
A w/c ratio higher than 0.60 is not acceptable as fresh concrete becomes "soup" [2] and leads to a higher porosity and to very poor quality hardened concrete as publicly stated by Prof. Gustave Magnel (1889-1955, Ghent University, Belgium) during an official address to American building contractors at the occasion of one of his visits in the ...
The test is carried out using a metal mould in the shape of a conical frustum known as a slump cone or Abrams cone, that is open at both ends and has attached handles.The tool typically has an internal diameter of 100 millimetres (3.9 in) at the top and of 200 millimetres (7.9 in) at the bottom with a height of 305 millimetres (12.0 in).The cone is placed on a hard non-absorbent surface.
UFAD systems use an underfloor supply plenum located between the structural concrete slab and a raised floor system to supply conditioned air to supply outlets (usually floor diffusers), located at or near floor level within the occupied space. Air returns from the room at ceiling level or the maximum allowable height above the occupied zone. [1]
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Concrete has a very low coefficient of thermal expansion, and as it matures concrete shrinks. All concrete structures will crack to some extent, due to shrinkage and tension. Concrete which is subjected to long-duration forces is prone to creep. The density of concrete varies, but is around 2,400 kilograms per cubic metre (150 lb/cu ft). [1]