Search results
Results from the WOW.Com Content Network
the rear of the F135 engine (nozzle rotated down) that powers the Rolls-Royce LiftSystem. Instead of using separate lift engines, like the Yakovlev Yak-38, or rotating nozzles for engine bypass air, like the Harrier, the "LiftSystem" has a shaft-driven LiftFan, designed by Lockheed Martin and developed by Rolls-Royce, [3] and a thrust vectoring nozzle for the engine exhaust that provides lift ...
25 mm to 60 mm with 5 mm steps; 60 mm to 110 mm with 10 mm steps; 110 mm to 140 mm with 15 mm steps; 140 mm to 500 mm with 20 mm steps; The standard lengths of the shafts are 5 m, 6 m and 7 m. Usually 1m to 5m is used.
Drummond designed these locomotives to answer the need for a larger and more powerful version of William Adams' 0-4-4 T1 class of 1888. The Adams T1's 5 ft 7 in (1,702 mm) wheels had been developed to meet the LSWR's requirement for a compact and sure-footed suburban passenger locomotive to be utilised on the intensive commuter timetables around London. [3]
The lift was built in 1929 by a private company, the Società Ligure per Impianto ed Esercizio Ascensori, to connect the main railway station of Genoa with Montegalletto, a name now in disuse that indicated the area at the time subject to a large urban expansion. It rose some seventy meters in altitude, but to reach the two cabins that can seat ...
Johnson Lifts started out doing lift maintenance. [8] The company installed its first lift at the New Woodlands Hotel in Chennai in 1966. [1] It began manufacturing lifts in 1970. [8] Johnson Lifts started out with a small manufacturing unit at Vyasarpadi, before moving to a larger facility in Ambattur in 1988. [9] K.J. John died in 2002. [8]
Headframe of the #1 Shaft at Oyuu Tolgoi. A steel headframe is less expensive than a concrete headframe; the tallest steel headframe measures 87 m. [4] Steel headframes are more adaptable to modifications (making any construction errors easier to remedy), and are considerably lighter, requiring less substantial foundations.
Assuming 1.0 kN/m 2 is applied for oiled steel formwork; Suction force: S = A x 1.0 kN/m 2 = 18 x 1.0 = 18 kN; Applied loads at element lifting (sling angle and lateral tension) F = W x Ksl x Ks x 0.5 = 64.8 x 1.16 x 1.2 x 0.5 = 45.1 kN; Anchor capacity for initial lift F/n = 23 kN per anchor during initial lift (n = 2 lifting anchors)
There are six lift shafts of varying heights and speeds, including a high-speed shaft with a travel of 100 metres (328 ft 1 in) and a theoretical maximum speed of 10 m/s (33 ft/s). The tower's renovation was officially completed in July 2010. [ 5 ]