Search results
Results from the WOW.Com Content Network
The Bandra–Worli Sea Link (officially known as Rajiv Gandhi Sea Link [1]) is a 5.6 km long, 8-lane wide cable-stayed bridge that links Bandra in the Western Suburbs of Mumbai with Worli in South Mumbai. It is the second longest sea bridge after Mumbai Trans Harbour Link, as well as the 5th longest bridge in India after Mumbai Trans Harbour ...
The Mumbai Trans Harbour Link, officially named as Atal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu and colloquially known as Atal Setu, is a 21.8 km (13.5 mi) 6-lane grade separated expressway [9] bridge, which connects Mumbai with Navi Mumbai, its satellite city. It is the longest sea bridge in India, and the world's 12th longest sea bridge.
The prefeasibility study for the Versova–Bandra Sea Link (VBSL) was conducted by CES (I) Pvt. Ltd in 2007-2008. The Government of Maharashtra appointed the Maharashtra State Road Development Corporation (MSRDC) as the nodal agency for the project on 19 December 2009. [12]
The Bandra-Worli Sea Link. The Bandra-Worli Sea Link was opened to traffic on 30 June 2009. The Sea Link reduces travel time between Bandra and Worli from 45 to 60 minutes to 7 minutes. The link has an average daily traffic of around 37,500 vehicles per day. The toll charged is ₹ 70 (84¢ US) for one-way and ₹ 105 (US$1.30) for a return ...
Bandra–Worli Sea Link (India) Pamban Bridge (India) Mumbai Trans Harbour Link (India) China Maldives Friendship Bridge ; Chesapeake Bay Bridge–Tunnel (United States) Hampton Roads Bridge–Tunnel (United States) Monitor–Merrimac Memorial Bridge–Tunnel (United States) Golden Gate Bridge (United States) Overseas Highway (United States)
As of 2024, Mumbai currently has 3 major operational or under construction sea-links: The Bandra–Worli Sea Link bridge is one of the longest bridges in the country, opened in 2009. It connects the suburbs of Bandra and Worli, and carries around 32,000 vehicles daily as of 2018. [3] The Trans Harbour Link is the longest
The bridge proposed in the report uses a four-span suspension bridge with a central tower height of 376 m, central span length of 3,000 m, and bridge length of about 8,400 m as the main bridge, connecting the Toyo Strait with two bridges, the extension would be about 12.7 km. [51] The total project cost is currently estimated to be about 1.3 ...
In 2019, the Atatürk – Izmir route had 728,279 passengers as the old Istanbul airport in Atatürk was also serving the traffic during this year. The new Istanbul airport in Havalimani opened on 6 April 2019.