enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Load profile - Wikipedia

    en.wikipedia.org/wiki/Load_Profile

    In a power system, a load curve or load profile is a chart illustrating the variation in demand/electrical load over a specific time. Generation companies use this information to plan how much power they will need to generate at any given time. A load duration curve is similar to a load curve. The information is the same but is presented in a ...

  3. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  4. Electricity billing in the UK - Wikipedia

    en.wikipedia.org/wiki/Electricity_billing_in_the_UK

    MSP kWh is the amount of electricity consumed at the 'meter supply point', which is the customer's meter. GSP kWh is obtained by multiplying the MSP kWh by the Line Loss Factor (LLF, a figure > 1) to include the amount of electricity lost when it is conducted through the distribution network, from the 'grid supply point' to the customer's meter.

  5. Maximum demand indicator - Wikipedia

    en.wikipedia.org/wiki/Maximum_demand_indicator

    Maximum Demand Indicator (MDI) is an instrument for measuring the maximum amount [clarification needed] of electrical energy required by a specific consumer during a given period of time. [1] MDI instruments record the base load requirement of electrical energy .

  6. Single-wire earth return - Wikipedia

    en.wikipedia.org/wiki/Single-wire_earth_return

    The transformers are usually rated at 5 kVA, 10 kVA, and 25 kVA. The load densities are usually below 0.5 kVA per kilometer (0.8 kVA per mile) of line. Any single customer's maximum demand will typically be less than 3.5 kVA, but larger loads up to the capacity of the distribution transformer can also be supplied.

  7. Rating plate - Wikipedia

    en.wikipedia.org/wiki/Rating_plate

    For an electric machine, the power rating is the number on its rating plate and corresponds to a maximum electric load it can carry. There is a distinction between the continuous rating (for generators, continuous maximum rating or CMR [ 2 ] ), at which the machine can be operational without a time limit and short-term rating that can only be ...

  8. Diversity factor - Wikipedia

    en.wikipedia.org/wiki/Diversity_factor

    The unofficial term diversity, as distinguished from diversity factor, refers to the percent of time available that a machine, piece of equipment, or facility has its maximum or nominal load or demand; a 70% diversity means that the device in question operates at its nominal or maximum load level 70% of the time that it is connected and turned on.

  9. Meter Point Administration Number - Wikipedia

    en.wikipedia.org/wiki/Meter_Point_Administration...

    Two meters installed, main and check, both recording the same load. The main meter being used for billing. COP2 10MW to 100MW Two meters installed as in COP3, but higher-accuracy class meters. COP1 > 100MW Very few sites in the UK at this level, generally power stations and connections with the National Grid.