Search results
Results from the WOW.Com Content Network
In a movable bridge that uses a rigid overhead rail, there is a need to transition from the catenary wire system into an overhead conductor rail at the bridge portal (the last traction current pylon before the movable bridge). For example, the power supply can be done through a catenary wire system near a swing bridge. The catenary wire ...
Overhead lines or overhead wires are used to transmit electrical energy to trams, trolleybuses or trains. Overhead line is designed on the principle of one or more overhead wires situated over rail tracks. Feeder stations at regular intervals along the overhead line supply power from the high-voltage grid.
The bridge may be stiffened by the addition of cables that do not bear the primary structural or live loads and so may be relatively light. These also add stability in wind. An example is the 220-meter-long (720 ft) bridge across the river Drac at Lac de Monteynard-Avignonet: this bridge has stabilizing cables below and to the side of the deck.
The exceptions shall be double-stacking, minimum overhead wiring height must be 6,500 mm (21 ft 3 + 7 ⁄ 8 in) (for maximum vehicle height of 6,150 mm [20 ft 2 + 1 ⁄ 8 in]) or 6,750 mm [22 ft 1 + 3 ⁄ 4 in] (for maximum vehicle height of 6,400 mm [20 ft 11 + 15 ⁄ 16 in]).
A three phase electric circuit terminated with a pothead Crossarms with two three phase electric circuits terminated with potheads. A pothead is a type of insulated electrical terminal used for transitioning between overhead line and underground high-voltage cable or for connecting overhead wiring to equipment like transformers. [1]
If local conditions are appropriate, an overhead line can be implemented by way of a valley bridge. For example, the Koersch valley bridge near Esslingen, Germany carries the 110 kV, three-phase line of the EnBW AG with 2 circuits. Because of the danger of short circuits from falling objects, undercrossings are typically avoided.
Online banks and digital accounts don't require the overhead of brick-and-mortar branches, allowing them to pass along savings to you in the form of even higher APYs than you might find in your ...
Since 1940. Used both third rail DC (1200 V) and overhead line AC (6.3 kV 25 Hz) until 1955. Also uses German standard 15 kV AC 16 2/3 Hz overhead electrification on the section between Neugraben and Stade on line S3, opened in December 2007.