Search results
Results from the WOW.Com Content Network
A Bailey bridge is a type of portable, pre-fabricated, truss bridge. It was developed in 1940–1941 by the British for military use during the Second World War and saw extensive use by British, Canadian and American military engineering units. A Bailey bridge has the advantages of requiring no special tools or heavy equipment to assemble.
Amersham Prefab (COAM)-front room showing solid-fuel fire Prefabs were aimed at families, and typically had an entrance hall, two bedrooms (parents and children), a bathroom (a room with a bath) — which was a novel innovation for many Britons at that time, a separate toilet, a living room and an equipped (not fitted in the modern sense) kitchen.
A house being built with prefabricated concrete panels. The most widely used form of prefabrication in building and civil engineering is the use of prefabricated concrete and prefabricated steel sections in structures where a particular part or form is repeated many times.
The number of treatment areas in the free-standing emergency room was not detailed in legal advertising for contractors. In addition, plans call for a 20,000-square-foot medical office building ...
The Callender-Hamilton bridge system is a prefabricated Panel/Floor Beam/Deck system designed to span bridging lengths ranging from 30 to 150 metres with road widths of one to three or more lanes. The design uses Warren trusses and is centred on a series of gusset plates that allow the direct attachment of the longitudinal, diagonal, vertical ...
A segmental bridge is a bridge built in short sections (called segments), i.e., one piece at a time, as opposed to traditional methods that build a bridge in very large sections. The bridge is made of concrete that is either cast-in-place (constructed fully in its final location) or precast concrete (built at another location and then ...
Rapid bridge replacement or accelerated bridge construction (ABC) is a technique that allows bridges to be replaced with minimum disruption to traffic. The replacement bridge is constructed on a site near the bridge to be replaced. When it is completed, the old bridge is cut away and removed using self-propelled modular transporters (SPMTs).
The major developments include the design of connection devices (coupler), transitions to other spanning beams such as steel pipes or profiles or reusable timber beams, and adjustable steel props. In 1935 W.A. de Vigier designed an adjustable steel prop which revolutionized many aspects of the construction industry including to support slab ...