Search results
Results from the WOW.Com Content Network
On September 19, 2024, S34's nosecone was rolled into the High bay ahead of integration with the payload bay. [198] The combined assembly was then rolled into the Starfactory, [199] and from there into Mega Bay 2. [200] S35's payload bay was rolled into the High Bay ahead of stacking with its nosecone. [201] This assembly was then rolled into ...
The satellite designs also required that the Space Shuttle have a 4.6 by 18 m (15 by 60 ft) payload bay. NASA evaluated the F-1 and J-2 engines from the Saturn rockets , and determined that they were insufficient for the requirements of the Space Shuttle; in July 1971, it issued a contract to Rocketdyne to begin development on the RS-25 engine.
The combined space station and Air Force payload requirements were not sufficient to reach desired shuttle launch rates. Therefore, the plan was for all future U.S. space launches—space stations, Air Force, commercial satellites, and scientific research—to use only the Space Shuttle. Most other expendable boosters would be phased out.
The four currently active space station cargo vehicles. Clockwise from top left: Progress, Cargo Dragon 2, Cygnus, Tianzhou. A number of different spacecraft have been used to carry cargo to and from space stations .
The Block 2 version of Starship is 52.1 m (171 ft) tall, 9 m (30 ft) wide, [15] and is composed of four general sections: the engine bay, the oxygen tank, the fuel tank, and the payload bay. [1] The retired Block 1 was constructed in a similar manner, though it was only 50.3 m (165 ft) tall.
Crew size Length (m) Diameter (m) Launch mass (kg) Power system Recovery method Payload (kg) ‡ First spaceflight § Last spaceflight Flights § Mercury USA: McDonnell Aircraft North American Aviation: LEO attained: Redstone MRLV Atlas LV-3B: 1: 3.34: 1.89: 1,400 Batteries Parachute splashdown (one drogue, one main) 1961 (1960) 1963: 6 (12 ...
The Space Shuttle was a partially reusable low Earth orbital spacecraft system operated by NASA (the National Aeronautics and Space Administration). Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft of which it was the only item funded for development. [ 1 ]
The 5-segment SRB, which would have required little change to the current shuttle infrastructure, would have allowed the space shuttle to carry an additional 20,000 lb (9,100 kg) of payload in a 51.6°-inclination orbit, eliminate the dangerous "Return-to-Launch Site" (RTLS) and "Trans-Oceanic Abort" (TAL) modes, and, by using a so-called "dog ...