Ad
related to: slab control joint spacing chart- 3296 Paris Ct, Westerville, OH · Directions · (614) 682-8345
Search results
Results from the WOW.Com Content Network
The underside of a waffle slab, showing the grid like structure. A waffle slab or two-way joist slab is a concrete slab made of reinforced concrete with concrete ribs running in two directions on its underside. [1] The name waffle comes from the grid pattern created by the reinforcing ribs.
Mortar with a breakaway bond may be used to fill some control joints. Control joints must have adequate depth and not exceed maximum spacing for them to be effective. Typical specifications for a four-inch-thick slab are: [8] 25% depth of material; spacing at 24 × to 36 × of slab depth (some specification call for a maximum of 30 ×)
Primary cracks (Figure 1) form when the tensile stress at the outer surface of the concrete reaches the tensile strength of concrete. When a primary crack forms, the concrete in the vicinity of the crack is relieved of any tension, resulting in a stress free zone near the crack.
Logo of Eurocode 2 An example of a concrete structure. In the Eurocode series of European standards (EN) related to construction, Eurocode 2: Design of concrete structures (abbreviated EN 1992 or, informally, EC 2) specifies technical rules for the design of concrete, reinforced concrete and prestressed concrete structures, using the limit state design philosophy.
A discontinuity may exist as a single feature (e.g. fault, isolated joint or fracture) and in some circumstances, a discontinuity is treated as a single discontinuity although it belongs to a discontinuity set, in particular if the spacing is very wide compared to the size of the engineering application or to the size of the geotechnical unit.
The ACI codebook puts an upward limit on the spacing between ties. ACI Code 7.10.5: Vertical spacing of ties shall not exceed 16 longitudinal bar diameters, 48 tie bar or wire diameters, or least dimension of the compression member. If the ties are spaced too far apart, the column will experience shearfailure and barrel in between the ties. [4]
A building joint is a junction where building elements meet without applying a static load from one element to another. When one or more of these vertical or horizontal elements that meet are required by the local building code to have a fire-resistance rating, the resulting opening that makes up the joint must be firestopped in order to restore the required compartmentalisation.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
Ad
related to: slab control joint spacing chart- 3296 Paris Ct, Westerville, OH · Directions · (614) 682-8345