enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Time of concentration - Wikipedia

    en.wikipedia.org/wiki/Time_of_concentration

    Time of concentration is a concept used in hydrology to measure the response of a watershed to a rain event. It is defined as the time needed for water to flow from the most remote point in a watershed to the watershed outlet. [1] It is a function of the topography, geology, and land use within the watershed.

  3. Drainage density - Wikipedia

    en.wikipedia.org/wiki/Drainage_density

    As a result, the water will require more time to reach the exit of the catchment. The lag time between the peak of the hyetograph and the hydrograph is then inversely related to drainage density; as drainage density increases, water is more efficiently drained from the basin and the lag time decreases. [7]

  4. Hydrograph - Wikipedia

    en.wikipedia.org/wiki/Hydrograph

    Not to be confused with lag time. Lag time the time interval from the maximum rainfall to the peak discharge. Time to peak time interval from the start of rainfall to the peak discharge. Time of concentration Time of concentration is the time from the end of the precipitation period to the end of the quick–response runoff in the hydrograph. [3]

  5. Runoff curve number - Wikipedia

    en.wikipedia.org/wiki/Runoff_curve_number

    The runoff curve number (also called a curve number or simply CN) is an empirical parameter used in hydrology for predicting direct runoff or infiltration from rainfall excess. [1] The curve number method was developed by the USDA Natural Resources Conservation Service , which was formerly called the Soil Conservation Service or SCS — the ...

  6. Hydrological model - Wikipedia

    en.wikipedia.org/wiki/Hydrological_model

    A hydrologic model is a simplification of a real-world system (e.g., surface water, soil water, wetland, groundwater, estuary) that aids in understanding, predicting, and managing water resources. Both the flow and quality of water are commonly studied using hydrologic models.

  7. Routing (hydrology) - Wikipedia

    en.wikipedia.org/wiki/Routing_(hydrology)

    Flood routing is a procedure to determine the time and magnitude of flow (i.e., the flow hydrograph) at a point on a watercourse from known or assumed hydrographs at one or more points upstream. The procedure is specifically known as Flood routing, if the flow is a flood. [14] [15] After Routing, the peak gets attenuated & a time lag is ...

  8. Discharge regime - Wikipedia

    en.wikipedia.org/wiki/Discharge_regime

    The time of the peak is determined by when the midday temperature sufficiently soars above 0 °C (32 °F), [3] which is usually considered to be when the average temperature reaches above −3 °C (27 °F). In the mildest continental climates, bordering the oceanic climate, the peak is usually in March on the Northern Hemisphere or September on ...

  9. Water balance - Wikipedia

    en.wikipedia.org/wiki/Water_balance

    The law of water balance states that the inflows to any water system or area is equal to its outflows plus change in storage during a time interval. [ 2 ] [ 3 ] In hydrology , a water balance equation can be used to describe the flow of water in and out of a system.