Ads
related to: calculate concrete yardage calculator cubic yards
Search results
Results from the WOW.Com Content Network
A cubic yard (symbol yd 3) [1] is an Imperial / U.S. customary (non-SI non-metric) unit of volume, used in Canada and the United States. It is defined as the volume of a cube with sides of 1 yard (3 feet , 36 inches , 0.9144 meters ) in length .
Concrete has a limited lifespan between batching / mixing and curing. This means that ready-mixed concrete should be placed within 30 to 45 minutes of the batching process to hold slump and mix design specifications in the US, [15] though in the UK, environmental and material factors, plus in-transit mixing, allow for up two hours to elapse. [16]
Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material. [2] Its usage worldwide, ton for ton, is twice that of steel, wood, plastics, and aluminium combined. [3]
{{convert|123|cuyd|m3+board feet}} → 123 cubic yards (94 m 3; 40,000 board feet) The following converts a pressure to four output units. The precision is 1 (1 decimal place), and units are abbreviated and linked.
0.75 m³ (1 cubic yard) cart-away mixing trailer. A variant of standard concrete transportation is the concrete (or, cement) mixing trailer. These small versions of transit-mix trucks are used to supply short loads of concrete. They have a concrete mixing drum with a capacity of between 0.76 and 1.34 cubic metres (1 and 1.75 cu yd).
[citation needed] In the concrete and petroleum industry, however, a bag of cement is defined as 94 lb (43 kg) because it has an apparent volume close to 1 cubic foot (28 litres). [64] When ready-mix concrete is specified, a "bag mix" unit is used as if the batching company mixes 5 literal bags of cement per cubic yard (or cubic metre) when a ...
Concrete has a very low coefficient of thermal expansion, and as it matures concrete shrinks. All concrete structures will crack to some extent, due to shrinkage and tension. Concrete which is subjected to long-duration forces is prone to creep. The density of concrete varies, but is around 2,400 kilograms per cubic metre (150 lb/cu ft). [1]
There are corresponding units of area and volume, the square yard and cubic yard respectively. These are sometimes referred to simply as "yards" when no ambiguity is possible, for example an American or Canadian concrete mixer may be marked with a capacity of "9 yards" or "1.5 yards", where cubic yards are obviously referred to.
Ads
related to: calculate concrete yardage calculator cubic yards