The A3 motorway (Romanian: Autostrada A3) is a partially built motorway in Romania, planned to connect Bucharest with the Transylvania region and the north-western part of the country.
This section of the motorway is fully operational and is composed of two segments: Bucharest – Pitești and Pitești bypass. The Bucharest – Pitești segment (95.9 km) is the first motorway class road built in Romania and remained the only one for more than 15 years, until the completion of the Fetești – Cernavodă segment on the A2 motorway in 1987.
The A6 motorway (Romanian: Autostrada A6) is a partially built motorway in Romania, planned to connect Bucharest with the Banat region, through the southern part of the country. [1]
The South Ring Motorway (51.3 km) was tendered as a concession contract in December 2012, that was supposed to be awarded in November 2013. [4] Yet, a new tender was announced in July 2017, that shall be completed between the end of 2017 and the first half of 2018, with an estimated cost of 580 million euros. [5]
The A7 motorway (Romanian: Autostrada A7), [1] also known as the Ploiești–Siret Motorway (Romanian: Autostrada Ploiești–Siret) or the Moldavia Motorway (Romanian: Autostrada Moldovei), [2] is a partially built motorway in Romania, that upon completion will link Ploiești to the north-eastern part of the country, partly along the Pan-European Corridor IX.
Bucharest has a fairly extensive subway system consisting of five lines (M1, M2, M3, M4, and M5) ran by Metrorex.In total, the network is 80.1 km (49.8 mi) long and has 64 stations, [1] with 1.5 km (0.9 mi) average distance between stops.
The Timișoara–Moravița Motorway (Romanian: Autostrada Timișoara–Moravița) is a proposed motorway in the southwestern part of Romania, labelled as A9. [1] It will connect the city of Timișoara to the border with Serbia.
It is divided into two major sections, the northern section and the southern section. The northern section has been widened to four lanes in 2010, [2] between the Chitila and the Voluntari junctions, [3] and a cable-stayed bridge was opened along the ring road in April 2011, in the Otopeni area, which overpasses the railway ring [4] (built by a joint-venture of the Spanish company FCC and the ...