Shoring is the process of temporarily supporting a building, vessel, structure, or trench with shores (props) when in danger of collapse or during repairs or alterations. Shoring comes from shore, a timber or metal prop. [1] Shoring may be vertical, angled, or horizontal.
Trench shoring is the process of bracing the walls of a trench to prevent collapse and cave-ins. The phrase can also be used as a noun to refer to the materials used in the process. The phrase can also be used as a noun to refer to the materials used in the process.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.
Trench shoring is often used in trenchworks to protect workers and stabilise the steep walls. An alternative to digging trenches is to create a utility tunnel. Such a tunnel may be dug by boring or by using a trench for cut-and-cover construction. The advantages of utility tunnels are the reduction of maintenance manholes, one-time relocation ...
In the UK, BS 5975 gives recommendations for the design and use of falsework on construction sites. It was first introduced by the British Standards Institute in March 1982 and the third version was published in 2008 with Amendment 1 in 2011.
Yet other systems use metal frame shoring towers, which the decks are attached to. Another common method is to attach the formwork decks to previously cast walls or columns, thus eradicating the use of vertical props altogether. In this method, adjustable support shoes are bolted through holes (sometimes tie holes) or attached to cast anchors.
Cribbing is usually accomplished with blocks of wood, often 4×4 (3 + 1 ⁄ 2 in or 89 mm) or 6×6 (5 + 1 ⁄ 2 in or 140 mm) and 18–24 in (460–610 mm) long.Soft woods, like spruce and pine, are often preferred because they crack slowly and make loud noises before completely failing, whereas stiffer woods may fail explosively and without warning.