Search results
Results from the WOW.Com Content Network
Track works and 3rd rail electrification works were completed on the 4.8 km (3.0 mi) east–west tunnel of the Purple line between Cubbon Park and Magadi Road and Bangalore Metro Rail Corporation Ltd (BMRCL) began trials on 23 November 2015. The entire stretch of the Purple Line was opened on 29 April 2016. [28]
The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India.The 21.25 km (13.20 mi) line connects Kalena Agrahara station (previously named Gottigere) on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north.
The Yellow Line of Namma Metro is a nearly-completed part of the metro rail network of Bengaluru, India. The 18.82 km (11.69 mi)-long line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. [1] R.V. Road station is the terminal station within the city, with an interchange with the Green Line.
The Blue Line or ORR-Airport Metro Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A (Central Silk Board to Krishnarajapura) and Phase-2B (Krishnarajapura to Airport). Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022.
Mahatma Gandhi Road (commonly referred to as MG Road) is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Purple line station was constructed by Punj Lloyd [ 2 ] and opened to the public on 20 October 2011. [ 3 ]
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Central Silk Board metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro.
Deepanjali Nagar is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro serving Deepanjali Nagar in Bengaluru, India. It was opened to the public on 16 November 2015. [1] [2]
The Red Line or Hebbal-Sarjapura Line is a proposed metro rail line that will become part of Namma Metro's network in the city of Bangalore, Karnataka, India. Phase-3A of Namma Metro has been planned to become operational around the year 2030. [2] [3] [4]