Ads
related to: leveling building site for shed
Search results
Results from the WOW.Com Content Network
The commonly used datum is mean sea level. [3] Dumpy level – optical instrument used to establish or check points in the same horizontal plane. It is used in surveying and building with a vertical staff to measure height differences and to transfer, measure and set heights. Also called a builder's level or leveling instrument.
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
Turning is a term used when referring to moving the level to take an elevation shot from a different location. To "turn" the level, one must first take a reading and record the elevation of the point the rod is located on. While the rod is being kept in exactly the same location, the level is moved to a new location where the rod is still visible.
This reduces the need to set the instrument base truly level, as with a dumpy level. Self-levelling instruments are the preferred instrument on building sites, construction, and during surveying due to ease of use and rapid setup time. A digital electronic level is also set level on a tripod and reads a bar-coded staff using electronic laser ...
A level staff, also called levelling rod, is a graduated wooden or aluminium rod, used with a levelling instrument to determine the difference in height between points or heights of points above a vertical datum. When used for stadiametric rangefinding, the level staff is called a stadia rod.
The water level at each end of the tube will be at the same elevation, whether the two ends are adjacent or far apart, so a line between them will be horizontal at its midpoint and a shed base, building foundation or similar structure laid out using several such lines will be "horizontal" within building tolerances on any scale over which use ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
An Ordnance Survey cut mark in the UK Occasionally a non-vertical face, and a slightly different mark, was used. The term benchmark, bench mark, or survey benchmark originates from the chiseled horizontal marks that surveyors made in stone structures, into which an angle iron could be placed to form a "bench" for a leveling rod, thus ensuring that a leveling rod could be accurately ...
Ads
related to: leveling building site for shed