enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Demand factor - Wikipedia

    en.wikipedia.org/wiki/Demand_factor

    This is the peak in the load profile divided by the full load of the device. Example: If a residence has equipment which could draw 6,000 W when all equipment was drawing a full load, drew a maximum of 3,000 W in a specified time, then the demand factor = 3,000 W / 6,000 W = 0.5

  3. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    load factor = ( [ 57 200 kWh / {30 d × 24 h/d} ] / 436 kW) × 100% = 18.22%; It can be derived from the load profile of the specific device or system of devices. Its value is always less than one because maximum demand is never lower than average demand, since facilities likely never operate at full capacity for the duration of an entire 24 ...

  4. Demand load - Wikipedia

    en.wikipedia.org/wiki/Demand_load

    In telecommunications, the term demand load can have the following meanings: In general, the total power required by a facility . The demand load is the sum of the operational load (including any tactical load) and nonoperational demand loads.

  5. Maximum demand indicator - Wikipedia

    en.wikipedia.org/wiki/Maximum_demand_indicator

    Maximum Demand Indicator (MDI) is an instrument for measuring the maximum amount [clarification needed] of electrical energy required by a specific consumer during a given period of time. [1] MDI instruments record the base load requirement of electrical energy .

  6. Diversity factor - Wikipedia

    en.wikipedia.org/wiki/Diversity_factor

    The diversified load is the total expected power, or "load", to be drawn during a peak period by a device or system of devices. The maximum system load is the combination of each device's full load capacity, utilization factor, diversity factor, demand factor, and the load factor. This process is referred to as load diversification.

  7. Peak demand - Wikipedia

    en.wikipedia.org/wiki/Peak_demand

    The highest demand during each month or even a single 15 to 30 minute period of highest use in the previous year may be used to calculate charges. [3] The renewable energy transition will include considerations for peak demand. [4] Economic growth of the state is inversely associated with peak load. [5]

  8. Load profile - Wikipedia

    en.wikipedia.org/wiki/Load_Profile

    Instead a load profile can be inferred from customer billing or other data. An example of a practical calculation used by utilities is using a transformer's maximum demand reading and taking into account the known number of each customer type supplied by these transformers. This process is called load research.

  9. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    The theoretical maximum energy output of a given installation is defined as that due to its continuous operation at full nameplate capacity over the relevant period. The capacity factor can be calculated for any electricity producing installation, such as a fuel consuming power plant or one using renewable energy , such as wind, the sun or ...