Cracked walls: Cracks may be horizontal, vertical, diagonal or stair-stepped. Severe pressure or structural damage is evident by widening cracks. Buckling walls: Usually caused by hydrostatic pressure. Walls appear to be bowed inward. Peeling paint: Water seeping through walls may lead to bubbling or peeling paint along basement walls. [4]
The second consideration is the high thermal mass of concrete slabs, which applies similarly to walls and floors, or wherever concrete is used within the thermal envelope. Concrete has a relatively high thermal mass, meaning that it takes a long time to respond to changes in ambient temperature. [9]
Concrete masonry units (CMUs) or blocks in a basement wall before burial. Blocks of cinder concrete (cinder blocks or breezeblocks), ordinary concrete (concrete blocks), or hollow tile are generically known as Concrete Masonry Units (CMUs). They usually are much larger than ordinary bricks and so are much faster to lay for a wall of a given size.
The concrete floor in most basements is structurally not part of the foundation; only the basement walls are. If there are posts supporting a main floor beam to form a post and beam system, these posts typically go right through the basement floor to a footing underneath the basement floor.
Wall framing in house construction includes the vertical and horizontal members of exterior walls and interior partitions, both of bearing walls and non-bearing walls. . These stick members, referred to as studs, wall plates and lintels (sometimes called headers), serve as a nailing base for all covering material and support the upper floor platforms, which provide the lateral strength along a
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]
In Latin America, contractors have started to use a form of lift slab construction where load-bearing concrete walls are raised at the same time as the floor slabs. Both the wall panels and the floor slabs are cast on the ground. The walls are attached to the slabs through hinges formed by plastic ropes.