Search results
Results from the WOW.Com Content Network
Bommanahalli (also known as Roopena Agrahara) is an upcoming elevated metro station on the North–South corridor of the Yellow Line of Namma Metro in Bangalore, India.. As per latest reports, the Yellow Line is slated to be operational around April 2025 [1] instead of January 2025 [2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
The Yellow Line of Namma Metro is a nearly-completed part of the metro rail network of Bengaluru, India.The 18.82 km (11.69 mi)-long line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. [1]
The BMRCL charges ₹ 50,000 (US$590) for shooting inside a metro station, and ₹ 40,000 (US$470) for shoots inside a metro train during peak hours between 6 am to 10 pm. During non-peak hours, from 10 pm to 4 am, the agency charges ₹ 50,000 (US$590) for shoots inside metro stations and ₹ 20,000 (US$230) inside a train.
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Bommasandra metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro.
The Namma Metro (English: Our metro), also known as Bangalore Metro, is the rapid transit system serving the city of Bangalore in India. [1] Out of the operational 68 metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. [2] [3] Evolution of Namma Metro
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Central Silk Board metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro.
BTM Layout is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.. As per latest reports, the Yellow Line is slated to be operational around April 2025 [1] instead of January 2025 [2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
Biocon Hebbagodi (formerly known as Hebbagodi) is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburban area of Bengaluru.. In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail Corporation Ltd to contribute ₹ 65 crore towards the construction of the metro station and donated land worth ₹ 30 crore for the project.